IP DECT base station Synchronisation
Issue 1 August 2006
19
An IP DECT installation is more reliable if a IP DECT base station can receive the signal from
more than only one IP DECT base station, because the other signals are also used for
synchronisation.
The synch-over-air solution is very reliable, because all existing redundant paths are used for
synchronisation. Thus, hardware tolerances have only very little influence. No IP DECT base
station has a key position. Example: If the Initial Master does not start up, another IP DECT
base station will be chosen by the ADMM.
Only unfavourable setups without redundant synchronisation paths can cause problems.
Sometimes IP DECT base stations do not need to be synchronized, e.g. if they are in different
buildings. These IP DECT base stations can be put into different clusters. IP DECT base
stations in different clusters will not be synchronised with each other. Different cluster start up
independent at the same time.
R 111
R 110
R 109
R 108
R 106
R 101
R 102
R 103
R 104
R 105
R 107
Unreliable Installation
R 111
R 110
R 109
R 108
R 106
R 101
R 102
R 103
R 104
R 105
R 107
Reliable Installation
Don‘t
Summary of Contents for Communication Manager IP DECT
Page 10: ...Overview 10 Avaya IP DECT Installation Administration and Maintenance...
Page 66: ...Installation and Configuration 66 Avaya IP DECT Installation Administration and Maintenance...
Page 72: ...Avaya Communication Manager 72 Avaya IP DECT Installation Administration and Maintenance...
Page 102: ...Maintenance 102 Avaya IP DECT Installation Administration and Maintenance...
Page 128: ...Appendix 128 Avaya IP DECT Installation Administration and Maintenance...