AV
A
L
O
N
www.avalonbrewer.com
(800) 561-6162
INSTALLATION MANUAL
AVALON
Gourmet
Gourmet
Gourmet
Gourmet
Gourmet
AVALON Gourmet Révision A
The preventive maintenance schedule and instructions below must be followed
to honor the warranty.
Parts
Monthly Quarterly 10,000 20,000 60,000 100,000
Brewer
Inspect
PM
Outlet valves
Inspect
PM
Water tank
Inspect
PM
6
PREVENTIVE MAINTENANCE
All major parts of this unit need to be maintained as per the schedule to honor the warranty and to prevent
them from failing. With adequate maintenance you will extend the life of your unit and deliver a consistent
high quality beverage.
6.1
Preventive Maintenance Schedule
All parts should be visually inspected upon each visit and cleaned as needed.
41
Preventive Maintenance