AV
A
L
O
N
www.avalonbrewer.com
(800)561-6162
AVALON Gourmet Révision A
AVALON
Gourmet
Gourmet
Gourmet
Gourmet
Gourmet
INSTALLATION MANUAL
Initial Setup
14
3.7
Electrical Connection
This equipment must be installed in compliance with applicable Federal, State, Provincial
and/or Local electrical codes having jurisdiction.
Make sure:
- The equipment is OFF before plugging it in,
- The equipment has its own electrical outlet and
- NO extension cord is used.
1. Make sure that the power switch in the back of the unit is in the OFF position before plugging in
the unit;
2. Locate the unit’s 6 feet power cord and plug it into its own grounded electrical outlet;
3. Reach to the back of the brewer and toggle the power switch to the ON position. The front lights
will turn on and water will automatically enter the brewer. The tank will fill for up to 2-3 minutes max.
4. Once the tank is full, it will take 10-15 minutes to heat the water to brewing temperature;
5. Once the brewing equipment is ready, the LCD will indicate “Hi! Make Your Choice”.
The main power switch turns the equipment ON and OFF. This switch should be turned OFF when
servicing any (AC line voltage) electrical components on the equipment.
OFF Position!