AV
A
L
O
N
www.avalonbrewer.com
(800) 561-6162
INSTALLATION MANUAL
AVALON
Gourmet
Gourmet
Gourmet
Gourmet
Gourmet
AVALON Gourmet Révision A
Initial Setup
13
3.6
Water Line Connection
Make sure that the equipment is unplugged before proceeding with the water supply
installation. Also verify that the incoming water pressure is greater than 20 psi and no more
than 80 psi.
1. Prior to installing the equipment, flush out the water line by running approximately 1 gal. of water into a pail.
This will ensure no sediment from a new installation can get in the equipment;
2. The incoming water supply should have a shut-off valve connected in-line. Water supply should be
a plastic 1/4” or 3/8” O.D. dedicated line branched off a larger supply line;
3. Make sure your water source is turned off. Secure the inlet fitting firmly onto the inlet valve. Do not
overtighten;
4. Make sure the equipment is unplugged. Connect the water line to the quick connect inlet fitting;
5. Turn the water valve on, sending water to the brewer. If there are any leaks, tighten connections to stop
leakage.
This procedure does not take into consideration the installation of a water filtration system.
Please refer to the water filter manufacturer installation instructions and incorporate them into
the above procedures.
This equipment must be installed in compliance with applicable Federal, State, Provincial
and/or Municipal plumbing codes having jurisdiction.
Adaptation
fitting