AV
A
L
O
N
www.avalonbrewer.com
(800) 561-6162
INSTALLATION MANUAL
AVALON
Gourmet
Gourmet
Gourmet
Gourmet
Gourmet
AVALON Gourmet Révision A
45
Servicing Part
s
7
SERVICING PARTS
This section is intended to assist you in servicing various parts of the unit.
7.1
Draining the Hot Water Tank
We recommend allowing 3 hours for the hot water to cool prior to emptying the tank. Make sure you have a
0.8 gallon container suitable for holding hot water.
1. Turn off and unplug the brewer;
2. Turn off the main water supply to the machine;
3. Remove the back panel;
4. Locate the drain tube with a red plug;
5. Direct the tube into the pail and remove the red plug.
Warning, water may be hot!
;
6. Drain the water from the water tank completely.
Drain Tube
Red Plug