Flooded Type Water Cooled Screw Chiller Technical M
anual
24
valve.
3.3 Pipeline Connection of Evaporator
1
.
Pipeline system of refrigeration water must be installed with anti-vibration joint, thermometer,
pressure gauge, water filter, electronic scale-borer, check valve, target-type flow controller,
discharge valve, drainage valve, stop valve and expansion water tank, etc.
2
.
Expansion water tank should be installed at the location 1~1.5m away from the highest point
of system. Capacity of water tank should be approximately 1/10 of water volume of the whole
Target-type flow controller
Automatic makeup valve
Stop valve
Overflow pipe
Stop valve
Water filter
Circulating water
pump
with
Anti-vibration
flexible joint
Inlet pipe of cooling water
Blow-down valve
Bypass stop valve
Flow switch
Blow-down valve
Outlet pipe of cooling water
Stop valve
Pressur
e gauge
Thermomet