• Stored energy (such as that in capacitors and hydraulic systems) must also
be addressed;
• After ensuring that no personnel are exposed and as a check to ensure
the lockout is working, operate the push button or other normal operating
controls to make certain the lift will not operate. Return the lift operating
controls to neutral position after the test;
• The equipment is now locked out.
Restoring Equipment to Service
• When the job is complete and equipment is ready for testing or normal
service, check the lift area to see that no one is exposed;
• When lift is clear, remove all locks. The energy isolating devices may be
operated to restore energy to lift.
Rules for Using Lockout Procedure: The lift shall be locked out to protect
against accidental or inadvertent operation when such operation could cause
injury to personnel. Never attempt to operate any switch, valve, or other energy
isolating device bearing a lock.
Summary of Contents for APEX-10
Page 1: ......
Page 19: ...Technical Specification 19 Apex 10 Apex 10H Figure 3a Standard Version...
Page 20: ...Technical Specification 20 Apex 10 Apex 10H Figure 3b Taller Version...
Page 23: ...Technical Specification 23 Apex 10 Apex 10H Figure 6 Electrical Diagram 220V 60Hz 1PH...
Page 26: ...Safety 26 Apex 10 Apex 10H...
Page 27: ...Safety 27 Apex 10 Apex 10H...
Page 30: ...Installation 30 Apex 10 Apex 10H Figure 8a Floor Plan...
Page 61: ...Parts Catalogue 61 Apex 10 Apex 10H Parts Catalogue ED 01 2015...