
Manual, FT Sensor, Ethernet Axia
Document #9610-05-Ethernet Axia-05
Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel:+1 919.772.0115 • Fax:+1 919.772.8259 •
• Email:
15
3.3 Installing the Sensor to the Robot
Parts required:
Refer to
and
.
Tools required: 4 mm hex wrench
Supplies required:
Clean rag, Loctite
®
242 (if applicable, refer to step
)
1. Clean the mounting surfaces.
2.
Attach the mounting interface plate to the robot arm with the mounting fasteners.
3.
Attach the sensor to the mounting interface plate.
•
Screws to have a minimum thread engagement length of 4.5 mm with a maximum thread
engagement less than the threaded depth listed in the customer drawing
.
•
If the sensor is to be used in a high-vibration environment, Loctite 242 should be applied to the (6)
M5 socket head cap screws, class 12.9 so that the fasteners secure the sensor to the mounting plate.
a.
Using a 4 mm hex wrench, secure the sensor to the mounting interface plate with (6) M5 socket
head cap screws, class 12.9. Tighten to 52 in-lbs (5.88 Nm).
4.
Once the sensor is installed on the robot, the customer tooling or tool interface plate can be installed.
•
Screws to have a minimum thread engagement length of 4.5 mm with a maximum thread
engagement less than the threaded depth listed in the customer drawing
.
•
If the sensor is to be used in a high-vibration environment, Loctite 242 should be applied to the (6)
M5 socket head cap screws, class 12.9 so that the fasteners secure the sensor to the mounting plate.
NOTICE:
The tool must not touch any other part of the sensor except the tool side; otherwise,
the sensor will not properly detect loads.
5. Connect the cable(s) to the sensor and customer application.
a.
Connect a power and Ethernet cable (ATI P/N 9105-C-ZC22-ZC26-X) to the sensor’s M8
connector. Tighten to 4.43 in-lbs (0.5 Nm).
b.
Connect the branched cable (ATI P/N 9105-C-ZC26-U-RJ45S-X) to the cable from step
. Tighten
to 7.08 in-lbs (0.8 Nm).
c.
Connect the RJ45 and power connections to the customer application. Refer to
for the LED outputs that occur whenever power is supplied to the sensor.
6.
Properly restrain and route the power and Ethernet cable; refer to
.
7.
After installation is complete, the sensor is ready for an accuracy check as described in