Protocol of Installation/Handover certificate
Location
Lift
_________________________
Producer
ATH
_________________________
Type/Model
_________________________
_________________________
serial n
˚
/
production year _________________________
The above mentioned lift was installed on the _________ and was handed over to the client
after start-up test and introducing of the operators totally functional.
The following points were checked:
Correct fixing of the lift with stud bolts
(According to the client the soil of the garage fullfil the foundation conditions in
accordance with the operation manual.)
Complete installation of all mounting parts as lifting arms, rubber pads, covers and so on
Checking sense of rotation of the on-site electrical connection
(According to the client the connection corresponds to VDE and EVU regulations)
Checking and explaining of the safety devices
- Function of safety notches and lifting arm locking
- Mode of operaton of emergency stops and synchronization ropes
Checking and explaining of maintenance devices
- Mobility and lubrication of movable parts
- Adjustment of chains and control ropes
Test run several times with intermediate stops until the end position –with and without
load (synchronism, limit stop, restart)
We point out that damages and errors which are occuring due to noncompliance of maintenace
and adjustment works (according to operation manual and intruduction), defective electrical
connections (rotating field, nominal voltage, fuse protection) or improper use (overload,
installation outside, technical changes) exclude the guarantee!
______________________________
Place, Date
______________________________
______________________________
Stamp/Signature installatioin company
Stamp/Signature client/operator
Summary of Contents for 2.32H2
Page 18: ...18 Plan für Fundament falls erforderlich Foundation plan if needed ...
Page 33: ...33 5 2 Warning symbols ...
Page 41: ...41 Explosionszeichnung Typ H Exploded drawing type H Zeichnung 1 Drawing 1 ...
Page 42: ...42 Explosionszeichnung Typ HL Exploded drawing type HL Zeichnung 2 Drawing 2 ...
Page 43: ...43 Zeichnung 4 Drawing 4 Zeichnung 3 Drawing 3 ...
Page 75: ...75 NOTIZEN NOTES ...