Chapter 2: Hardware Information
2-12
To install a 3.5” hot-swap storage device to the front panel:
1.
Push the spring lock to the right (A),
then pull the tray lever outward (B)
to release the tray. The tray ejects
slightly after you pull out the lever.
2.
Firmly hold the tray lever and pull the
tray out of the bay.
3.
Place the tray on a flat and stable surface.
4.
Prepare the 3.5” hot-swap storage device and the bundled set of screws.
Spring lock
Tray lever
Summary of Contents for RS720-E9-RS8
Page 1: ...2U Rackmount Server User Guide RS720 E9 RS8 RS8 G ...
Page 28: ...Chapter 1 Product Introduction 1 18 ...
Page 84: ...Chapter 2 Hardware Information 2 56 ...
Page 90: ...Chapter 3 Installation Options 3 6 3 3 Rail kit dimensions 589mm 43 6mm 900mm 43 6mm ...
Page 92: ...Chapter 4 Motherboard Information 4 2 4 1 Motherboard layout ...
Page 116: ...Chapter 4 Motherboard Information 4 26 ...
Page 158: ...5 42 Chapter 5 BIOS Setup ...
Page 200: ...A 8 Appendix ...