14
k.
Repeat above process for each additional timer period required.
Note: It is important that timer periods do not overlap each other as this may result in intermittent or
erratic operation of your equipment. Once all timer periods are set, observe start and finish times for each
and ensure no overlap occurs.
l.
The final timer period (if configured in your setup) is for “Heat Demand”. This feature allows
you to bring your filtration or heating pump on each hour to sample the water temperature
of your pool or spa. If the temperature is below the set point, the pump will continue to
operate until the desired temperature is achieved then it will switch off. To program heat
demand;
i.
Go to the bottom of the timer list and find Heat Demand. Touch on the word
“Disabled”.
Summary of Contents for Viron Connect 10
Page 12: ...12 g Choose heater status if installed h Choose active lighting zones if installed...
Page 16: ...16...
Page 21: ...21 76mm centers...
Page 43: ...43 Section 11 Touch Screen Installation Instructions cont...
Page 44: ...44 Section 11 Touch Screen Installation Instructions cont...
Page 45: ...45 Section 11 Touch Screen Installation Instructions cont...
Page 56: ...56...
Page 74: ......
Page 75: ......
Page 76: ......