 BASE BUILDING DIMENSIONS

COMMANDER

 SERIES

Gloves must be worn 

at all times to reduce 

risk of injury!

Each Module adds an additional 57 1/2” (146,1 cm) in length, 47.2 Sq. Ft. (4,4 

 m2

additional storage area, and 324 Cu. Ft. (9,2 

m3

) additional storage volume.

Owner’s Manual
& Assembly Guide

01H

717740813

    Size rounded off to the nearest foot

 For proper base construction see page 5

Exterior Dimensions

(Roof Edge to Roof Edge)

    Width          Depth         Height

Interior Dimensions

(Wall to Wall)

    Width          Depth         Height

Door

Opening

    Width          Height

 Approx.

Size

Storage 

Area

10’ x 10’

101 Sq. Ft.   697 Cu. Ft.

123 1/4”

128 3/4”

92 1/2”

118 1/4”

123 1/2”

91 1/4”

98 1/4”

72 3/4”

3,0 m x 3,1 m

9,4 m2         19,7 m3

313,1 cm

327,0 cm

235,0 cm

300,4 cm

313,7 cm

231,8 cm

249,6 cm

184,8 cm

10x10

Base Size

122 1/4” x 127 1/2”

310,5 cm x 323,9 cm

Additional

per Module

122 1/4” x 57 1/2”

310,5 cm x 146,1 cm

* See Inside for Detailed Safety Information.

TM

R

MOUNTAINEER

 SERIES

All Sizes

Summary of Contents for Commander series

Page 1: ...rest foot For proper base construction see page 5 Exterior Dimensions Roof Edge to Roof Edge Width Depth Height Interior Dimensions Wall to Wall Width Depth Height Door Opening Width Height Approx Siz...

Page 2: ...the roof of the building When using a step ladder make sure that it is fully open and on even ground before climbing on it Do NOT attempt to assemble your building on a windy day The large panels can...

Page 3: ...windy day Be careful on wet or muddy ground Use Teamwork Two or more people are required to assemble your building One person can hold the parts or panels in place while the other person fastens them...

Page 4: ...you purchased a building 15 4 6 m in length or longer you should have at least one carton labeled GA5M C1GA C2GA GA5M Nominal Size Extension Modules 3 0 m x 3 1 m 0 3 0 m x 4 6 m 1 3 0 m x 6 1 m 2 3...

Page 5: ...will be voided The platform should be level and at free of bumps ridges etc to provide good support for the building The necessary materials may be obtained from your local lumber yard To construct th...

Page 6: ...Description List 5 6 10 11 1 2 3 4 8 9 13 14 7 12 11 32 Hex 2 Phillips 2 Phillips 1 65103 Hex Nut 8 32 292 2 65923 Small Bolt 8 32 x 3 8 10 mm 256 3 65004 Small Screw 8AB x 5 16 8 mm 354 4 66611 Large...

Page 7: ...hillips 2 Phillips 2 Phillips 6 Various fasteners are used throughout the construction of your building In each step you will see the abbreviations listed below used in the illustrations to help you i...

Page 8: ...Wall Diagonal 4 20 C2GA 10629 Rear Frame 4 21 C2GA 10630 Rear Wall Channel 2 22 C2GA 10631 Rear Wall Diagonal 2 23 C2GA 10632 Side Frame 4 24 C2GA 10633 Front and Rear Side Wall Channel 4 25 C2GA 1063...

Page 9: ...ay be joined in pairs Bend to separate 14 14 14 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 3 4 3 4 5 5 6 6 7 7 8 8 9 9 10 10 11 17 17 17 17 20 20 20 20 8 8 21 21 22 22 23 23 23 23 24 24 24 24 25 25 26 27...

Page 10: ...Vertical Door Brace 4 11 C2GA 10675 Cane Bolt Bracket 2 PARTS LIST DOORS MODULE Key Carton Part Part Qty No No No Description List 12 GA5M 7822 Wall Panel 4 13 GA5M 7743 Roof Panel 4 14 GA5M 6015 Roof...

Page 11: ...Post Insert ts inside Part No 20 Truss Post and is not shown above 14 12 12 12 12 13 13 13 13 14 16 16 17 17 18 18 19 19 19 20 20 22 22 23 24 23 25 25 15 Left Door 1 9 9 9 9 4 4 10 6 7 8 11 5 3 10 Rig...

Page 12: ...mbly Set aside for use on next page With the Upper and Lower Chord Trusses positioned as shown below attach Shear Plates where indicated below Attach Shear Plates using Small Bolts and Nuts to Upper C...

Page 13: ...10 x15 3 0 m x 4 6 m 1 3 10 x20 3 0 m x 6 1 m 2 4 10 x25 3 0 m x 7 5m 3 5 10 x30 3 0 m x 9 0 m 4 6 The number of Trusses you will need to construct your building will depend on the size of your build...

Page 14: ...s by 4 10 2 cm and connect them to the Wall Post in the center of the Rear Wall using Small Bolts and Nuts as shown Do not tighten at this time 1 2 Attach other two Wall Posts at the sides of the Rear...

Page 15: ...where the Panels overlap Do not secure the Corner Panel to the Rear Wall itself this will be done in Step 5 3 Carefully set the Rear Wall Assembly aside for use in Step 5 4 Place Washers on all Bolts...

Page 16: ...ront Frame 2 10638 Long Fascia 1 10639 Short Fascia 1 Lay out the parts and position them as shown Double check that holes align as shown If holes do not align the Wall Post Hinge is most likely upsid...

Page 17: ...e these pieces are joined take care when moving them as the Door Header may bend 5 QTY 8 QTY 12 Assemblies from previous page Left Front Wall Assembly Right Front Wall Assembly Door Header Assembly LE...

Page 18: ...or Frames 1 2 32 7 8 83 5 cm from the edge of each Floor Frame erect a Truss Assembly and secure using a Large Screw on each side Once two Truss Assemblies are in place connect them with a Mid Side Wa...

Page 19: ...ams in the same manner Remove Bolts holding Truss peaks together from Step 1 6 Next place two Middle Roof Beams back to back and secure with two Small Bolts and Nuts as shown above This is the Main Ro...

Page 20: ...for each additional Module Overlap Side Frames by 8 1 4 21 0 cm Refer to page 13 to see how many Trusses should be included in your building One Side Frame per side is added for each additional Extens...

Page 21: ...Side Frame with one Large Screw per side as shown 1 2 Slide one end of the Front and Rear Side Wall Channel behind the Corner Panel and secure with a Large Screw Secure the other end with a Large Scre...

Page 22: ...s shown and secure with a Large Screw on both sides Install Front and Rear Side Wall Channels using Large Screws 1 22H IMPORTANT When install ing the Front Wall Assembly in the building two people sho...

Page 23: ...ge Screws where the Wall Angles meet the Trusses Where the Wall Angles overlap align the holes as shown to the left and insert two Small Bolts and Nuts to secure All Side Wall Angles overlap by 8 1 4...

Page 24: ...row to Top Frames Secure the middle row to Wall Channels Secure the lower row to Floor Frames Secure the circled holes to the Panel next to it FASTEN TO TOP FRAMES FASTEN TO FLOOR FRAMES FASTEN TO WA...

Page 25: ...nd three Small Screws in the bottom of the Panel Roll the Panel back as shown on the previous page and overlap the rib with the rib of the next Panel 1 2 Secure the Panels with a Small Bolt and Nut th...

Page 26: ...Gable edge Install Edge Trim to cover Gable Edge BEFORE doing ANY work with Gables Failure to do so could result in injury QTY 8 Leg of Roof Beam Bracket must face center of Gable as shown You will ne...

Page 27: ...shown below and insert a single Small Bolt and Nut through the second hole from the bottom only 3 4 Position Track Supports as shown Secure Track Supports to Gable using one Small Bolt and Nut Secure...

Page 28: ...sing the Weather Stripping Tape as shown 5 6 Secure two Front and Rear Roof Beams together with a single Bolt to form the Main Roof Beam as shown above The end of the Main Roof Beam with the open hole...

Page 29: ...and Nut as shown 8 9 Rotate to align with Roof Beam and secure to Roof Beam with one Small Bolt and Nut as shown Repeat Steps 9 2 thru 9 9 to install Gables at the front of the building The Gables in...

Page 30: ...the Roof Panel Placement Order Diagram on this page Read thru all of Roof Assembly before beginning Step 10 The building is square when diagonal measurements are equal Whenever a crimped rib and an u...

Page 31: ...1 from the diagram below Carefully remove the Gable Edge Trim once the Panel is in position 1 2 Fasten Panel to Gable by placing Small Bolts and Nuts through holes 2 7 Fasten the holes in order Work...

Page 32: ...P EP EP RP RP RP RP EP RP RP RP RP RP RP RP RP RP RP RP RP RP RP RP RP RC F R RC F R RC MID RC MID RC MID RC MID EP End Panel 8578 8579 RP Roof Panel 7743 RC F R Front and Rear Ridge Cap 10621 RC MID...

Page 33: ...n a rib overlap and under the Ridge Cap 1 3 Secure rib 5 with two Small Bolts and Nuts as shown to the right and then cover with two 2 5 1 cm strips of Weather Stripping Tape 2 Attach the rst four Pan...

Page 34: ...SB You will need Ridge Cap F R 1 10621 QTY 2 SB Ridge Cap Mid 1 10680 End of Ridge Cap with four holes must face toward the outside of the building Do not secure at this time End of Ridge Cap with fo...

Page 35: ...skip this page and move on to page 36 Overlap the last Ridge Cap installed with the next Ridge Cap and secure with two Small Bolts and Nuts as shown 9 DO NOT fully tighten Ridge Cap Bolts until you ha...

Page 36: ...OT secure ends of Ridge Caps until Peak Caps are in place Continue to apply Weather Stripping QTY 52 QTY 6 Bolts under Ridge Cap pass thru slots where the End Roof Panel is overlapped by the Panel nex...

Page 37: ...n each end Pay close attention to where the Left and Right Roof Trim pieces are located Left Trim 2 80017 Right Trim 2 10620 Trim Cap L 2 Trim Cap R 2 Peak Cap 2 QTY 16 QTY 8 80017 Left Roof Trim 1062...

Page 38: ...close attention to how Panels are positioned Below are end views showing Panel position 1 Hinge Side Hinge Side Door Panel Hinge 2 10623 Right Door Panel 1 10624 Left Door Panel 1 80051 10623 Right Do...

Page 39: ...attention to how parts are positioned Make sure hinge holes in the Vertical Door Brace Hinge line up with hinge holes in Door Panel Hinge 10635 10635 10635 10635 10635 10637 10637 10637 10678 Horiz Do...

Page 40: ...eck that the open ends of the Vertical Door Braces face the edges of the Door see image to right and secure with Large Screws in each Door NOTE Doors are shown pictured from inside building 3 Open end...

Page 41: ...ring Latch as shown this will help alignment B Where Braces overlap insert a Long Bolt through all Braces and Door Panel and secure with a Nut C Secure Diagonal Braces to Doors in all corners with Lar...

Page 42: ...rews Repeat for other Door 6 Align the Cane Bolt with the holes in the Cane Bolt Bracket and Vertical Door Brace and secure with six Large Screws as shown Repeat for other Door Cane Bolt 2 66780 Cane...

Page 43: ...sition Door Trim and Astragals as shown and secure with Large Screws Lock Eyelet slides thru Astragal on right Door and is secured with two Large Bolts and Square Nuts Pay close attention to the posit...

Page 44: ...Large Bolts and Square Nuts This completes the Left Door assembly 8 Slide end of Latch Plate behind Door Brace Slide Latch Plate into position on the Right Door Next position the Door Handle on the f...

Page 45: ...S Hinge 6 66609 QTY 36 FS You will need Swing the Doors carefully to check alignment If Doors are misaligned slightly loosen the Bolts on the Door Jamb side of the hinge and realign the Door Fully tig...

Page 46: ...ny suggested base Contains 4 Anchors with Cable Clamps and installation instructions Anchoring into Wood Post Use 1 4 6 mm Wood Screws There are 1 4 6 mm dia holes provided in the frames for proper an...

Page 47: ...ree of moisture oils dirt or grime and then apply an even lm of high quality touch up paint Various paint manufacturers provide products for rust treatment and coverage If surface rust does appear on...

Page 48: ...masonry drill bit are included TOOL HANGING RACK Model No TH100 The perfect tool organizer Twin 25 1 2 64 8 cm steel channels plus ve heavy duty snap in hangers and a small tool holder for screwdrive...

Reviews: