VP5000-DC/DC60, VP5000-DC/DC200-HL
Installation and commissioning
Last edited 2019-02-08
by Sonja Scheunert
Filename
VP5000_DCDC60_200-HL_installation_manual_v1-4en.docx
109 / 173
Figure 77: Crimping the cable lug
7.
Crimp the cable lug. See figure (5).
Figure 78: Applying shrink tubing
8.
Secure the wire terminal and the cable
shield with shrink tubing. See figure (6)
Make sure that the cable shield remains
free along the length (b).
9.
Check the finished cable according to the
specifications of DIN EN 62477-1 to
visually check the insulation.