![Aqualisa Rise digital Installation Manual Download Page 8](http://html1.mh-extra.com/html/aqualisa/rise-digital/rise-digital_installation-manual_2960105008.webp)
Rise
™
Installation Guide 08
SYSTEM LAYOUT DIAGRAMS
Supply
Hot water
cylinder
10m
max
Shower
controller
Typical UHW system installation
(compatible with standard Quartz Smart Valve
TM
)
Supply
Pressure
reducing valve
if required
10m
max
Shower
controller
Typical combination boiler installation
(compatible with standard Quartz Smart Valve
TM
)
Supply
Hot water cylinder
Connect
‘A’ or ‘B’
Cold feed
to cylinder
B
A
10m
max
Shower
controller
Typical gravity system installation
(compatible with pumped Quartz
Smart Valve
TM
)
NB: THE BASE OF THE QUARTZ
SMART VALVE
TM
MUST BE SITED
NO HIGHER THAN THE BASE
LEVEL OF THE CISTERN
10m
max
Shower
controller
Central
heating
boiler
Supply
Typical thermal storage unit system installation
(compatible with standard Quartz
Smart Valve
TM
)
Supply
Underside of cistern
Hot water
cylinder
Cold feed
to cylinder
Connect
‘A’ or ‘B’
B
A
10m
max
Shower
controller
Typical pumped system installation
(compatible with standard Quartz Smart Valve
TM
)
NB: 1.5 bar MINIMUM
universal pump rating
Supply
Hot water
cylinder
10m
max
Shower
controller
Typical UHW system installation
(compatible with standard Quartz Smart Valve
TM
)
Supply
Pressure
reducing valve
if required
10m
max
Shower
controller
Typical combination boiler installation
(compatible with standard Quartz Smart Valve
TM
)
Supply
Hot water cylinder
Connect
‘A’ or ‘B’
Cold feed
to cylinder
B
A
10m
max
Shower
controller
Typical gravity system installation
(compatible with pumped Quartz
Smart Valve
TM
)
NB: THE BASE OF THE QUARTZ
SMART VALVE
TM
MUST BE SITED
NO HIGHER THAN THE BASE
LEVEL OF THE CISTERN
10m
max
Shower
controller
Central
heating
boiler
Supply
Typical thermal storage unit system installation
(compatible with standard Quartz
Smart Valve
TM
)
Supply
Underside of cistern
Hot water
cylinder
Cold feed
to cylinder
Connect
‘A’ or ‘B’
B
A
10m
max
Shower
controller
Typical pumped system installation
(compatible with standard Quartz Smart Valve
TM
)
NB: 1.5 bar MINIMUM
universal pump rating
Supply
Hot water
cylinder
10m
max
Shower
controller
Typical UHW system installation
(compatible with standard Quartz Smart Valve
TM
)
Supply
Pressure
reducing valve
if required
10m
max
Shower
controller
Typical combination boiler installation
(compatible with standard Quartz Smart Valve
TM
)
Supply
Hot water cylinder
Connect
‘A’ or ‘B’
Cold feed
to cylinder
B
A
10m
max
Shower
controller
Typical gravity system installation
(compatible with pumped Quartz
Smart Valve
TM
)
NB: THE BASE OF THE QUARTZ
SMART VALVE
TM
MUST BE SITED
NO HIGHER THAN THE BASE
LEVEL OF THE CISTERN
10m
max
Shower
controller
Central
heating
boiler
Supply
Typical thermal storage unit system installation
(compatible with standard Quartz
Smart Valve
TM
)
Supply
Underside of cistern
Hot water
cylinder
Cold feed
to cylinder
Connect
‘A’ or ‘B’
B
A
10m
max
Shower
controller
Typical pumped system installation
(compatible with standard Quartz Smart Valve
TM
)
NB: 1.5 bar MINIMUM
universal pump rating