IMPORTANT INFORMATION

Safety information

This appliance can be used by children aged 

from 3 years and above and persons with 

reduced physical, sensory or mental capabilities 

or lack of experience and knowledge if they 

have been given supervision or instruction 

concerning use of the appliance in a safe way 

and understand the hazards involved.
Children shall not play with the appliance.
Cleaning and user maintenance shall not be 

made by children without supervision.
This product must be installed by a competent 

person in accordance with all relevant current 

local and national Water Supply Regulations.

ALL PRODUCTS REQUIRING AN ELECTRICAL 

CONNECTION MUST BE INSTALLED BY A 

QUALIFIED PERSON FOLLOWING THE 

LATEST REVISION OF THE ELECTRICAL 

WIRING REGULATIONS, BOTH NATIONAL 

AND LOCAL AND CERTIFIED TO CURRENT 

BUILDING REGULATIONS.

This system should be installed so that other 

taps or appliances operated elsewhere within 

the premises do not significantly affect the flow.
The Quartz Smart Valve

 must not be used with 

a hot water supply temperature of over 65ºC. If 

the maximum hot water temperature is likely to 

rise above 65ºC then a Thermostatic Blending 

Valve must be used.
The Quartz Smart Valve

 is supplied factory 

pre-set at maximum temperature of 45ºC.  

The maximum temperature is fully adjustable  

to suit site conditions. If adjusted, we 

recommend the outlet temperature is set  

to a MAXIMUM of 46ºC.
The Quartz Smart Valve

 must be installed in an 

accessible location for servicing and maintenance.
The Quartz Smart Valve

 must not be installed 

in situations where either the ambient 

temperature is likely to exceed 40ºC or where 

freezing may occur.

The controller must not be installed in situations 

where the ambient temperature is likely to fall 

below 5ºC or rise above 40ºC.
We do not recommend the use of a controller  

in steam therapy facilities.
This appliance must be earthed.

Cables must be protected by a suitably sized 

conduit or trunking to avoid risk of damage and 

to allow removal for service and maintenance 

purposes

Ensure that the conduit is run to avoid the 

controller fixing holes.
Surface mounted cables must also be protected 

by a suitable approved conduit, even in a loft, 

where there may be a risk of damage from vermin.
The power lead must only be replaced by the 

manufacturer or his accredited agent.
The controller is supplied from a safety low 

voltage source.
This product is suitable for domestic use only.
Aqualisa products are supplied complete with  

a 1 year guarantee that can be upgraded by 

registering the product with Aqualisa. 
See www.aqualisa.co.uk/guarantee for details.

Installation of the pumped Quartz Smart 

Valve

 (for gravity stored systems)

The pumped Quartz Smart Valve

 shower 

system is designed to operate up to a maximum 

static pressure of 100kPa ((1 bar)(10 metres 

head)(14.5psi)). Under no circumstances must 

the pumped Quartz Smart Valve

 be connected 

directly to the water main or in line with another 

booster pump.
The minimum actual capacity of the cold  

water storage cistern should be not less than 

225 litres (50 gallons). The capacity of the hot 

water cylinder must be capable of meeting 

anticipated demand.

Summary of Contents for Rise digital

Page 1: ...RISE INSTALLATION GUIDE...

Page 2: ...ible location for servicing and maintenance The Quartz Smart Valve must not be installed in situations where either the ambient temperature is likely to exceed 40 C or where freezing may occur The con...

Page 3: ...mp works on both positive and negative head conditions MUST be used with divert products The minimum actual capacity of the cold water storage cistern should be not less than 225 litres 80 gallons The...

Page 4: ...tion of the product Declaration of conformity Aqualisa Products Limited declares that the Quartz Smart Valve and controller in conjunction with the diverter and remote control complies with the essent...

Page 5: ...Mains fed and separately pumped water systems only Exposed components HP Combi Mains fed and separately pumped water systems only Concealed components Gravity Pumped Gravity stored water systems only...

Page 6: ...Rise Installation Guide 06 WALL MOUNTED COMPONENTS CEILING MOUNTED COMPONENTS...

Page 7: ...Rise Installation Guide 07 Ceiling mounted fixed head Wall mounted fixed head Rise exposed with adjustable height head Rise concealed with adjustable height head...

Page 8: ...mpatible with standard Quartz Smart ValveTM Supply Hot water cylinder Connect A or B Cold feed to cylinder B A 10m max Shower controller Typical gravity system installation compatible with pumped Quar...

Page 9: ...m installation compatible with standard Quartz Smart ValveTM NB 1 5 bar MINIMUM universal pump rating Supply Pressure reducing valve if required 10m max Shower controller Typical combination boiler in...

Page 10: ...all relevant EMC standards if incorrectly sited it may interfere with digital TV reception Please follow the recommendations below to minimise this effect If TV interference is an issue a service kit...

Page 11: ...mmissioning purposes When fitted i the area around the Quartz TM smart valve must be board environment The optimum position for the Quartz TM smart valve and d the Q TM controller site to take full ad...

Page 12: ...or fixed he 350mm 265mm 70mm roduct the processor MUST be Un pro an 15 Co po in wi ac ba 14 TH We co Th or BE SU ELE PER Attach the supply pipes to the Digital processor ensuring that the cold and hot...

Page 13: ...Ensure the data cable is held securely by the narrow middle slot of the mounting plate and fix to the wall using the brass screws provided 11 Plug the data cable into the rear of the controller and pu...

Page 14: ...ed with the fixing brackets will increase the depth to 70mm from the wall Ensuring the rail assembly has been passed through the hole in the ceiling and is at the desired height mark the screw holes a...

Page 15: ...rt pillar Secure to the wall using the screws provided Place the upper rail bracket support pillar into the desired location ensuring that both the hose restraint and the Aqualisa Pinch Grip holder ar...

Page 16: ...n the fittings Before any electrical adjustment is attempted the electricity supply must be turned off at the mains switch Electrical installation may only be carried out by a qualified person All cop...

Page 17: ...lear any debris Turn the shower off and isolate from the electricity supply 23 A further data cable socket has been provided for use with a remote control or diverter This can be accessed by carefully...

Page 18: ...shower or bath systems fitted to combination boilers When making any adjustment to the Quartz Smart Valve settings the power MUST be isolated 32 Reinstate the electrical supply to the Quartz Smart Val...

Page 19: ...tlet using a 15mm copper pipe Slide the wall spacer down the projecting pipe flush with the finished wall surface 1 Slide the 15mm gripper ring down the projecting pipe flush with the wall spacer fitt...

Page 20: ...lace the wall outlet mounting plate onto the pipe assembly and mark and prepare the fixing points using the fixings provided if suitable 6 Secure the wall mounting plate to the wall using the screws p...

Page 21: ...vers depressed 12 Carefully slide the gel hook onto the rail under the Aqualisa Pinch Grip holder Current Water Supply Regulations state that the handset should not be allowed to pass a point 25mm abo...

Page 22: ...rear of the bottom rail bracket to disengage the rail locking tab Carefully ease the rail up and away from the fixing bracket 17 Ensuring the hose washers are in the correct position attach the hose t...

Page 23: ...ht 21 Reattach the hose to the head by inserting the anti swivel connector back into the bottom of the handset and then ensuring the tab is pressed to lock the retaining clip back into place 22 Push t...

Page 24: ...with the wall spacer fitting 4 Ensure the pipe is clean and free of dust and slide the fixing bush onto the pipe flush with the finished wall surface 5 Slide the fixed head arm over the fixing bush fl...

Page 25: ...nds to clear any debris that may be present 10 Slide the cover plate into position flush with the finished wall surface 11 Ensuring the rubber washer is in the correct position attach the shower head...

Page 26: ...he QuartzSmart Valve diverter to the preferred position for the fixed head 2 Locate the position for the fixed head in the bathroom and firstly drill a pilot hole to mark the position before checking...

Page 27: ...g a 32mm spanner if necessary to facilitate 7 Cut off the excess pipe allowing for a suitable working length to allow for the required 22mm connection If a push fit connector is to be used then the pi...

Page 28: ...ing the grub screw and 2 5mm hexagonal key provided 11 Ensuring the rubber washer is in the correct position attach the shower head to the fixed arm and carefully secure using a suitable spanner or a...

Page 29: ...DJUSTABLE HEAD USER GUIDE To avoid residual water dripping from the shower head after use we advise to tilt the head to allow residual water to drain out The above recommendation applies to both adjus...

Page 30: ...ions substances that are not suitable for plastics and electroplated surfaces must not be used Cleaning and maintenance Your Rise shower system should be cleaned using only a soft cloth and washing up...

Page 31: ...ail enquiries aqualisa co uk Republic of Ireland Sales enquiries 01 864 3363 Service enquiries 01 844 3212 Please note that calls may be recorded for training and quality purposes The company reserves...

Reviews: