Aqualisa Rise digital Installation Manual Download Page 11

Rise

 Installation Guide  11

1

To ensure safe operation and installation of this product, the Quartz Smart Valve

  

MUST be installed in one of the orientations shown.

300 mm

210 mm

70 mm

300 mm

210 mm

QUARTZ

TM

 SMART VALVE AND DIVERTER

1

To ensure safe operation and installation of this product, the Quartz

TM

 smart valve and 

diverter MUST be installed in one of the orientations shown.

PLEASE NOTE: If installing a diverter please also note all areas marked with this symbol.

INSTALLATION

 

 

For installation with the diverter.

2

Isolation valves are supplied with the Quartz

TM

 smart valve and  

diverter valve and must be fitted on both inlets and the blended 
water outlet/ outlets. For optimum performance on gravity fed 
systems 22mm pipe work should be run as close to the Quartz

TM

 

smart valve as possible before reducing down to 15mm. All pipe 
work should be supported.

The inlet supply centres are 48mm. 

Please note arrow on isolation valve to indicate direction of flow. 

DO NOT use compression fittings on the inlet and outlet spigots this will affect the    

warranty if fitted. 

3

Choose the position for your 

Quartz

TM

 smart valve as close to the shower control as possible. 

The Quartz

TM

 smart valve may be sited in the roof space above the proposed shower site, in the 

airing cupboard or behind a screwed bath panel if more convenient. If siting in the roof space, 
ensure that freezing cannot occur and that no insulation material is placed under or over the 
Q

TM

 smart valve or diverter. Please refer to the system layout.

 

If installing a diverter, choose the position for the 

Quartz

TM

 smart valve as close to the  

diverter as possible, within the range of the 2m connecting data cable provided.

4

Place the Quartz

TM

 smart valve on a solid mounting surface, and 

place the fixing feet into suitable positions. Mark then drill and 
prepare suitable fixings before securing the Quartz

TM

 smart valve 

to the mounting surface using the screws provided, (if suitable).

 

If installing the diverter this also needs to be installed as per the 
above instructions in step 4

5

Flush through both hot and cold supply pipes.

The maximum hot water inlet temperature must be no more than 65˚C.

6

Attach the supply pipes to the Quartz

TM

 smart valve, ensuring that 

the cold and hot feeds are fitted into the appropriately marked 
inlets. 

Do not solder near to plastic components.

7

Prepare and connect a pipe from the mixed water outlet on the 
Quartz

TM

 smart valve through the wall to the proposed siting for 

the shower outlet.
Using pipe clips as appropriate, ensure that all pipe work is  

 

perpendicular to the Quartz

TM

 smart valve, i.e. not putting any 

strain on the fittings.

 

 If installing a diverter prepare and connect the pipe from the mixed water outlet on the Q

TM

 

smart valve through to the diverter inlet. The diverter can be fitted directly onto to the  
Q

TM

 smart valve outlet if required on the HP/Combi system installation. A cranked M/F elbow 

is supplied for the Gravity Pumped system for ease of installation. Refer to images in point 1. 

 

Ensure the isolation valves are connected to the diverter outlets with the arrows correctly 
aligned according to the direction of flow. Using pipe clips as appropriate, ensure that all pipe 
work is perpendicular to the Quartz

TM

 smart valve and diverter, i.e. not putting any str

ain on the fittings.

Prepare and connect the pipes from the diverter outlets to the proposed siting for the outlets.

To maximise flow rates we recommend using copper pipe with the minimum amount of 

elbows on all pipes leading to and from the Quartz

TM

 smart valve. 

Ensure the pipe work connections have been flushed through.
If fitting a bath outlet, a suitable non restrictive double check valve (not supplied) MUST be 

fitted to the blended outlet pipe in line with the current water regulations.

BEFORE ANY ELECTRICAL ADJUSTMENT IS ATTEMPTED, THE ELECTRICITY SUPPLY MUST BE 
TURNED OFF AT THE MAINS SWITCH.
ELECTRICAL INSTALLATION MAY ONLY BE CARRIED OUT BY A QUALIFIED PERSON.

 

 

!

8

Unscrew the single fixing on top of the Quartz

TM

 smart valve and 

carefully tilt the lid up and off the location lugs and pull the lid clear. 

 

If installing the diverter also remove the lid following the 
instructions above in step 8.

9

As installation differs for different controls please refer to the relevant smart controller  
installation guide for the Quartz

TM

 smart valve and diverter wiring.

10

Connect the Quartz

TM

 smart valve power lead to a double pole 3 

amp fuse switched spur incorporated in the fixed wiring circuit, in 
accordance with current wiring rules. Ensure that this is located  
in an accessible, dry location and not in the bathroom. 

THIS APPLIANCE MUST BE EARTHED                                                     
We recommend protecting surface mounted cables in suitable approved conduit to avoid the risk of 
damage from vermin.
The power lead should also be clipped in place with ‘P’ clips or similar to avoid accidents.

 

 

!

11

The Q

TM

 smart valves are supplied factory set with the flow rate at 

either 

‘NORMAL HP’

 or 

‘NORMAL GRAVITY’

 mode depending on 

which  system has been ordered.

BALANCED HP SYSTEMS:

Standard Q

TM

 smart valves fitted to balanced high pressure sys-

tems may be set to ‘NORMAL HP’ or for water economy ‘ECO’ 
modes.  

STANDARD COMBINATION BOILER SYSTEMS:

For Standard Quartz

TM

 smart valves installed on combi boiler  

systems, for optimum performance we recommend setting to the 
‘COMBI’ mode.

The ‘ECO’ flow rate mode should NOT be selected for shower or bath systems fitted  

to combination boilers.

PUMPED QUARTZ

TM  

SMART VALVE:                                                                                         

Pumped Quartz

TM

 smart valves are fitted to gravity systems may be set to ‘NORMAL 

GRAVITY’ or for water economy ‘ECO’ modes.  

When making any adjustment to the Quartz

TM

 smart valve settings the power must    

be isolated.

12

Run the shower at maximum temperature (factory pre set to 
45ºC). If required, maximum temperature adjustment can be 
made with a flat bladed screwdriver using the 

‘MAX TEMP 

ADJUSTMENT’ 

control as indicated. When the temperature 

has been set to the desired position, carefully replace the 
Quartz

TM

 smart valve lid and secure the fixing screw, hand 

tight only.

Site conditions can affect temperature settings, installer to adjust as required.

All copper pipe work must be cross-bonded and connected to a reliable earthing point.

13

Please refer to the separate Q

TM

 controller installation guide to complete installation. 

Quartz

TM

 smart valve connected 

directly to diverter valve

Quartz

TM

 smart valve connected to 

diverter with additional pipe 

Quartz

TM

 smart valve connected 

directly to diverter valve

Quartz

TM

 smart valve connected 

to diverter with additional pipe 

HP/Combi Quartz

TM

 smart valve

Gravity pumped Quartz

TM

 smart valve

This product must be installed by a competent person in accordance with the relevant  

current Water Supply Regulations.
In addition to the guide below it is essential that the written instructions overleaf are read 

and understood and that you have all the necessary components (shown bottom right)  

before commencing installation. 
The Quartz

TM

 smart valves are supplied with universal fixings intended to secure it to a  

solid mounting surface.

 

 

!

 

 

!

The Quartz

TM

 smart valve and diverter must be sited in a position that is safely accesible  

for servicing and commissioning purposes. When fitted in the loft space, the route to and 

the area around the Quartz

TM

 smart valve must be boarded to ensure a safe working  

environment. 
The optimum position for the Quartz

TM

 smart valve and diverter is in the roof space above 

the Q

TM

 controller site to take full advantage of the ease and speed of installation.

The distance between the Quartz

TM

 smart valve and main Q

TM

 controller must be within the 

range of the 10m data cable supplied. 
The diverter inlet has been designed to enable connection directly inline with the HP/

Combi Quartz

TM

 smart valve outlet isolation valve connection or off the Gravity Pumped 

Quartz

TM

 smart valve outlet using the cranked M/F elbow connection fitting.

 ). .

 

 

!

 

 

!

 

 

!

 

 

!

 

 

!

 

 

!

Single outlet

Components (Gravity pumped)

Components (HP/Combi)

Components (Gravity pumped)

Components (HP/Combi)

Single outlet

With diverter

With diverter

265mm

70mm

350mm

270mm

445mm

445mm

270mm

Max 2m

Max 2m

197mm

240mm

70mm

210 mm

450 mm

QU
ARTZ

TM

 SMART V

AL

VE AND DIVERTER

1

To ensur

e sa
fe oper

ation and installation o

f this pr

oduct, 

the Q

uartz

TM

 smart v

alv

e and 

div

erter

 M

UST be installed in one o

f the orien

tations sho

wn.

PLEASE

 NO
TE: I
f installing a div

erter

 please also no

te all ar

eas mark

ed with 

this s

ymbol.

INST
ALL
ATION

 

 

For

 installation with 

the div

erter

.

2

Isolation v

alv

es ar

e supplied with 

the Q

uartz

TM

 smart v

alv

e and 

 

div

erter

 v

alv

e and must be fitted on bo

th inlets and 

the blended 

w

ater
 outlet/ outlets. F

or

 op
timum perf

ormanc

e on gr

av

ity

 fed 

sy

stems 22mm pipe w

ork should be run as close 

to 

the Q

uartz

TM

 

smart v

alv

e as possible bef

or

e r

educing do

wn 
to 15mm. All pipe 

w

ork should be supported.

The inlet supply

 c

en

tr

es ar

e 48mm. 

Please no

te arr

ow on isolation v

alv

to indicate dir

ection o

f flo
w

DO NO

T use c

ompr

ession fittings on 

the inlet and outlet spigo

ts 

this will aff

ect 
the 
  

w

arr

an

ty

 if fitted. 

3

Choose 

the position 

for

 y

our
 Q

uartz

TM

 smart v

alv

e as close 

to 

the sho

w

er

 c

on

tr

ol as possible. 

The Q
uartz

TM

 smart v

alv

e ma

y be sited in 

the r

oo

f spac

e abo

ve 

the pr

oposed sho

w

er

 site, in 

the 

airing cupboar

d or
 behind a scr

ew

ed bath panel if mor

e c

on

venien

t. I

f siting in 

the r

oo

f spac

e, 

ensur

that 

fr

eezing canno

t oc
cur
 and 

that no insulation material is plac

ed under

 or

 o

ver

 the 

Q

TM

 smart v

alv

e or
 div
erter

. Please r

ef

er

 to 

the s

ystem la

yout.

 

If installing a div

erter

, choose 

the position 

for

 the 
Q

uartz

TM

 smart v

alv

as close 

to 

the 
 

div

erter

 as possible, within 

the r

ange o

f the 2m c

onnecting data cable pr

ov

ided.

4

Plac

the Q

uartz

TM

 smart v

alv

e on a solid moun

ting surf

ac

e, and 

plac

the fixing 

feet in

to suitable positions. Mark 

then drill and 

pr

epar
e suitable fixings bef

or

e securing 

the Q

uartz

TM

 smart v

alv

to 

the moun

ting surf

ac

e using 

the scr

ews pr

ov

ided, (if suitable

).

 

If installing 

the div

erter

 this also needs 

to be installed as per

 the 

abo
ve instructions in step 4

5

Flush 
thr

ough bo

th ho

t and c

old supply

 pipes.

The maximum ho

t w

ater
 inlet 

temper

atur
e must be no mor

than 65˚C.

6

Attach 

the supply

 pipes 

to 

the Q

uartz

TM

 smart v

alv

e, ensuring 

that 

the c

old and ho

t f

eeds ar

e fitted in

to 

the appr

opriately

 mark

ed 

inlets. 

D

o no
t solder

 near

 to plastic c

omponen

ts.

7

Pr

epar
e and c

onnect a pipe 

fr

om 
the mix

ed w

ater
 outlet on 

the 

Q

uartz

TM

 smart v

alv

thr

ough 

the w

all 

to 

the pr

oposed siting 

for

 

the sho

w

er

 outlet.

U

sing pipe clips as appr

opriate, ensur

that all pipe w

ork is 

  

perpendicular

 to 

the Q

uartz

TM

 smart v

alv

e, i.e. no

t putting an

str

ain on 

the fittings.

 

 If installing a div

erter

 pr

epar
e and c

onnect 

the pipe 

fr

om 
the mix

ed w

ater
 outlet on 

the Q

TM

 

smart v

alv

thr

ough 

to 

the div

erter

 inlet. 

The div

erter

 can be fitted dir

ectly

 on
to 

to 

the 
 

Q

TM

 smart v

alv

e outlet if r

equir

ed on 

the HP

/C

ombi s

ystem installation. A cr

ank
ed M/F elbo

is supplied 

for

 the G

rav

ity

 P

umped s

ystem 

for

 ease o

f installation. R

ef

er

 to images in poin

t 1. 

 

Ensur

the isolation v

alv

es ar

e c

onnected 

to 

the div

erter

 outlets with 

the arr

ows c
orr
ectly

 

aligned ac

cor

ding 

to 

the dir

ection o

f flo
w

. U

sing pipe clips as appr

opriate, ensur

that all pipe 

w

ork is perpendicular

 to 

the Q

uartz

TM

 smart v

alv

e and div

erter

, i.e. no

t putting an

y str

ain on 

the fittings.

Pr

epar
e and c

onnect 

the pipes 

fr

om 
the div

erter

 outlets 

to 

the pr

oposed siting 

for

 the outlets.

To maximise flo

w r

ates w

e r

ec

ommend using c

opper

 pipe with 

the minimum amoun

t o

elbo
ws on all pipes leading 

to and fr

om 
the Q

uartz

TM

 smart v

alv

e. 

Ensur

the pipe w

ork c

onnections ha

ve been flushed 

thr

ough.

If fitting a bath outlet, a suitable non r

estrictiv

e double check v

alv

e (no

t supplied) M

UST be 

fitted 

to 

the blended outlet pipe in line with 

the curr

en

t w

ater
 regulations.

BEF
ORE

 ANY
 ELE
CTRICAL

 AD
JUST

MENT

 IS

 A

TTEMPTED

, THE
 ELE
CTRICITY

 SUPPL

Y M

UST
 BE

 

TURNED

 OFF
 A

T THE
 MAINS

 SWIT

CH
.

ELE
CTRICAL INST

ALLA

TION

 M

AY

 ONL
Y BE

 CARRIED

 OUT
 BY

 A QU

ALIFIED PERSON.

 

 

!

8

U

nscr
ew 
the single fixing on 

top o

f the Q

uartz

TM

 smart v

alv

e and 

car
efully

 tilt 
the lid up and o

ff 

the location lugs and pull 

the lid clear

 

If installing 

the div

erter

 also r

emo
ve 

the lid 

follo
wing 

the 

instructions abo

ve in step 8.

9

As installation diff

ers 
for

 diff
er

en

t c

on

tr

ols please r

ef

er

 to 

the r

ele

van

t smart c

on

tr

oller
  

installation guide 

for

 the Q

uartz

TM

 smart v

alv

e and div

erter

 wiring.

10

C

onnect 

the Q

uartz

TM

 smart v

alv

e po
w

er

 lead 

to a double pole 3 

amp 

fuse s

witched spur

 inc
orpor

ated in 

the fix

ed wiring cir

cuit, in 

ac

cor

danc

e with curr

en

t wiring rules. E

nsur

that 

this is located 

 

in an ac

cessible, dry

 location and no

t in 
the bathr

oom. 

THIS APPLIANCE M

UST BE EAR

THED                                                     

W

e r

ec

ommend pr

otecting surf

ac

e moun

ted cables in suitable appr

ov

ed c
onduit 

to a
void 
the risk o

damage 

fr

om v

ermin.

The po

w

er

 lead should also be clipped in plac

e with ‘P’ clips or

 similar

 to a
void ac

ciden

ts.

 

 

!

11

The Q

TM

 smart v

alv

es ar

e supplied 

factory

 set with 

the flo

w r
ate at 

either

 

‘NORMAL HP’

 or

 

‘NORMAL GRA

VITY’

 mode depending on 

which  s

ystem has been or

der
ed.

BALANCED HP S

YSTEMS:

Standar

d Q

TM

 smart v

alv

es fitted 

to balanc

ed high pr

essur

e s

ys-

tems ma

y be set 

to ‘NORMAL HP’ or

 for

 w

ater
 ec

onom

y ‘E

C

O’ 

modes.  

ST

AND

ARD C

O

MBINA

TION BOILER S

YSTEMS:

For

 S

tandar

d Q
uartz

TM

 smart v

alv

es installed on c

ombi boiler

  

sy

stems, 

for

 op
timum perf

ormanc

e w
e r

ec

ommend setting 

to 

the 

‘C

O

MBI’ mode.

The ‘E
C

O’ flo

w r

ate mode should NO

T be selected f

or

 sho
w

er

 or

 bath s

ystems fitted 

 

to c
ombination boilers.

PU

MPED QU

ARTZ

TM  

SMART V

AL

VE:                                                                                        

 

Pumped Q

uartz

TM

 smart v

alv

es ar

e fitted 

to gr

avity
 sy

stems ma

y be set 

to ‘NORMAL 

GRA
VITY’ or

 for

 w

ater
 ec

onom

y ‘E

C

O’ modes.  

When making an

y adjustmen

t to 

the Q

uartz

TM

 smart v

alv

e settings 

the po

w

er

 must 

  

be isolated.

12

Run 

the sho

w

er

 at maximum 

temper

atur
e (

factory

 pr

e set 

to 

45ºC). I

f r

equir

ed, maximum 

temper

atur
e adjustmen

t can be 

made with a flat bladed scr

ew

driv
er

 using 

the 

‘MAX 

TEMP 

AD
JUST

MENT’ 

con

tr

ol as indicated. When 

the 
temper

atur

has been set 

to 

the desir

ed position, car

efully

 replac

the 

Q

uartz

TM

 smart v

alv

e lid and secur

the fixing scr

ew

, hand 

tigh
t only

.

Site c
onditions can aff

ect 
temper

atur
e settings, installer

 to adjust as r

equir

ed.

All c

opper

 pipe w

ork must be cr

oss-bonded and c

onnected 

to a r

eliable earthing poin

t.

13

Please r

ef

er

 to 

the separ

ate Q

TM

 c

on

tr

oller
 installation guide 

to c
omplete installation.

 

Q

uartz

TM

 smart v

alv

e c

onnected 

dir

ectly

 to div

erter

 v

alv

e

Q

uartz

TM

 smart v

alv

e c

onnected 

to 

div

erter

 with additional pipe 

Q

uartz

TM

 smart v

alv

e c

onnected 

dir

ectly

 to div

erter

 v

alv

e

Q

uartz

TM

 smart v

alv

e c

onnected 

to div

erter

 with additional pipe 

HP

/C

ombi Q

uartz

TM

 smart v

alv

e

G

ravity
 pumped Q

uartz

TM

 smart v

alv

e

This pr

oduct must be installed b

y a c
ompeten

t person in ac

cor

danc

e with 

the r

ele

van

t  

curr
en

t W
ater
 S

upply

 R

egulations.

In addition 

to 

the guide belo

w it is essen

tial 
that 

the written instructions o

verleaf ar

e r

ead 

and understood and 

that y

ou ha

ve all 
the nec

essary

 c

omponen

ts (sho

wn bo

ttom righ

t) 

 

bef
or

e c

ommencing installation. 

The Q
uartz

TM

 smart v

alv

es ar

e supplied with univ

ersal fixings in

tended 

to secur

e it 
to a 
 

solid moun

ting surf

ac

e.

 

 

!

 

 

!

The Q
uartz

TM

 smart v

alv

e and div

erter

 must be sited in a position 

that is saf

ely

 ac

cesible 

 

for

 servicing and c

ommissioning purposes. When fitted in 

the lo

ft spac

e, 

the r

oute 

to and 

the ar

ea ar

ound 

the Q

uartz

TM

 smart v

alv

e must be boar

ded 
to ensur

e a saf

e w
orking 

 

en

vir

onmen

t. 

The op

timum position f

or

 the Q

uartz

TM

 smart v

alv

e and div

erter

 is in 

the r

oo

f spac

e abo

ve 

the Q

TM

 c

on

tr

oller
 site 

to 

tak

e full adv

an

tage o

f the ease and speed o

f installation.

The distanc

e betw

een 
the Q

uartz

TM

 smart v

alv

e and main Q

TM

 c

on

tr

oller
 must be within 

the 

range o

f the 10m data cable supplied. 

The div

erter

 inlet has been designed 

to enable c

onnection dir

ectly

 inline with 

the HP

/

C

ombi Q

uartz

TM

 smart v

alv

e outlet isolation v

alv

e c

onnection or

 o

ff 

the G

ravity
 P

umped 

Q

uartz

TM

 smart v

alv

e outlet using 

the cr

ank
ed M/F elbo

w c
onnection fitting.

 ) . .

 

 

!

 

 

!

 

 

!

 

 

!

 

 

!

 

 

!

Single outlet

C

omponen

ts (
G

ravity
 pumped)

C

omponen

ts (HP

/C

ombi)

C

omponen

ts (
G

ravity
 pumped)

C

omponen

ts (HP

/C

ombi)

Single outlet

With div

erter

With div

erter

265mm

70mm

350mm

270mm

445mm

445mm

270mm

Max 2m

Max 2m

197mm

240mm

70mm

450 mm

210 mm

70 mm

2

Isolation valves are supplied with the Quartz Smart Valve

 and 

must be fitted on both inlets and the blended water outlet. All 
pipe work should be run in 15mm pipe. All pipe work should be 
supported. For externally pumped gravity fed installations, 22mm 
pipe work should be run as close to the Quartz Smart Valve

 as 

possible before reducing down to 15mm.

The inlet supply centres are 48mm.
Please note arrow on isolation valve to indicate direction of flow.
DO NOT use compression fittings on the inlet and outlet spigots this will affect the 
warranty if fitted.

 

 

!

To ensure optimum performance use the minimum amount of elbows.
To maximise flow rates we recommend using copper pipe with the minimum amount of elbows.

 

 

!

3

Choose the position for your Quartz Smart Valve

 as close to 

the controller as possible. The Quartz Smart Valve

 may be sited 

in the roof space above the proposed shower site, in the airing 
cupboard or behind a screwed bath panel if more convenient. If 
siting in the roof space, ensure that freezing cannot occur and 
that no insulation material is placed under or over the The Quartz 
Smart Valve

Please refer to the system layout diagrams.

Exposed installation 

example shown

The 

Quartz Smart Valve

  MUST be sited in a position that is safely accessible for servicing 

and commissioning purposes. When fitted in a loft space, the route to and the area around 
the 

Quartz Smart Valve

 must be boarded to ensure a safe working environment.

The optimum position for the Quartz Smart Valve

 is in the roof space above the controller 

site to take full advantage of the ease and speed of installation.

The distance between the Quartz Smart Valve

 and the controller must be within the range 

of the 10m data cable supplied.

Summary of Contents for Rise digital

Page 1: ...RISE INSTALLATION GUIDE...

Page 2: ...ible location for servicing and maintenance The Quartz Smart Valve must not be installed in situations where either the ambient temperature is likely to exceed 40 C or where freezing may occur The con...

Page 3: ...mp works on both positive and negative head conditions MUST be used with divert products The minimum actual capacity of the cold water storage cistern should be not less than 225 litres 80 gallons The...

Page 4: ...tion of the product Declaration of conformity Aqualisa Products Limited declares that the Quartz Smart Valve and controller in conjunction with the diverter and remote control complies with the essent...

Page 5: ...Mains fed and separately pumped water systems only Exposed components HP Combi Mains fed and separately pumped water systems only Concealed components Gravity Pumped Gravity stored water systems only...

Page 6: ...Rise Installation Guide 06 WALL MOUNTED COMPONENTS CEILING MOUNTED COMPONENTS...

Page 7: ...Rise Installation Guide 07 Ceiling mounted fixed head Wall mounted fixed head Rise exposed with adjustable height head Rise concealed with adjustable height head...

Page 8: ...mpatible with standard Quartz Smart ValveTM Supply Hot water cylinder Connect A or B Cold feed to cylinder B A 10m max Shower controller Typical gravity system installation compatible with pumped Quar...

Page 9: ...m installation compatible with standard Quartz Smart ValveTM NB 1 5 bar MINIMUM universal pump rating Supply Pressure reducing valve if required 10m max Shower controller Typical combination boiler in...

Page 10: ...all relevant EMC standards if incorrectly sited it may interfere with digital TV reception Please follow the recommendations below to minimise this effect If TV interference is an issue a service kit...

Page 11: ...mmissioning purposes When fitted i the area around the Quartz TM smart valve must be board environment The optimum position for the Quartz TM smart valve and d the Q TM controller site to take full ad...

Page 12: ...or fixed he 350mm 265mm 70mm roduct the processor MUST be Un pro an 15 Co po in wi ac ba 14 TH We co Th or BE SU ELE PER Attach the supply pipes to the Digital processor ensuring that the cold and hot...

Page 13: ...Ensure the data cable is held securely by the narrow middle slot of the mounting plate and fix to the wall using the brass screws provided 11 Plug the data cable into the rear of the controller and pu...

Page 14: ...ed with the fixing brackets will increase the depth to 70mm from the wall Ensuring the rail assembly has been passed through the hole in the ceiling and is at the desired height mark the screw holes a...

Page 15: ...rt pillar Secure to the wall using the screws provided Place the upper rail bracket support pillar into the desired location ensuring that both the hose restraint and the Aqualisa Pinch Grip holder ar...

Page 16: ...n the fittings Before any electrical adjustment is attempted the electricity supply must be turned off at the mains switch Electrical installation may only be carried out by a qualified person All cop...

Page 17: ...lear any debris Turn the shower off and isolate from the electricity supply 23 A further data cable socket has been provided for use with a remote control or diverter This can be accessed by carefully...

Page 18: ...shower or bath systems fitted to combination boilers When making any adjustment to the Quartz Smart Valve settings the power MUST be isolated 32 Reinstate the electrical supply to the Quartz Smart Val...

Page 19: ...tlet using a 15mm copper pipe Slide the wall spacer down the projecting pipe flush with the finished wall surface 1 Slide the 15mm gripper ring down the projecting pipe flush with the wall spacer fitt...

Page 20: ...lace the wall outlet mounting plate onto the pipe assembly and mark and prepare the fixing points using the fixings provided if suitable 6 Secure the wall mounting plate to the wall using the screws p...

Page 21: ...vers depressed 12 Carefully slide the gel hook onto the rail under the Aqualisa Pinch Grip holder Current Water Supply Regulations state that the handset should not be allowed to pass a point 25mm abo...

Page 22: ...rear of the bottom rail bracket to disengage the rail locking tab Carefully ease the rail up and away from the fixing bracket 17 Ensuring the hose washers are in the correct position attach the hose t...

Page 23: ...ht 21 Reattach the hose to the head by inserting the anti swivel connector back into the bottom of the handset and then ensuring the tab is pressed to lock the retaining clip back into place 22 Push t...

Page 24: ...with the wall spacer fitting 4 Ensure the pipe is clean and free of dust and slide the fixing bush onto the pipe flush with the finished wall surface 5 Slide the fixed head arm over the fixing bush fl...

Page 25: ...nds to clear any debris that may be present 10 Slide the cover plate into position flush with the finished wall surface 11 Ensuring the rubber washer is in the correct position attach the shower head...

Page 26: ...he QuartzSmart Valve diverter to the preferred position for the fixed head 2 Locate the position for the fixed head in the bathroom and firstly drill a pilot hole to mark the position before checking...

Page 27: ...g a 32mm spanner if necessary to facilitate 7 Cut off the excess pipe allowing for a suitable working length to allow for the required 22mm connection If a push fit connector is to be used then the pi...

Page 28: ...ing the grub screw and 2 5mm hexagonal key provided 11 Ensuring the rubber washer is in the correct position attach the shower head to the fixed arm and carefully secure using a suitable spanner or a...

Page 29: ...DJUSTABLE HEAD USER GUIDE To avoid residual water dripping from the shower head after use we advise to tilt the head to allow residual water to drain out The above recommendation applies to both adjus...

Page 30: ...ions substances that are not suitable for plastics and electroplated surfaces must not be used Cleaning and maintenance Your Rise shower system should be cleaned using only a soft cloth and washing up...

Page 31: ...ail enquiries aqualisa co uk Republic of Ireland Sales enquiries 01 864 3363 Service enquiries 01 844 3212 Please note that calls may be recorded for training and quality purposes The company reserves...

Reviews: