![Aqualisa Rise digital Installation Manual Download Page 12](http://html1.mh-extra.com/html/aqualisa/rise-digital/rise-digital_installation-manual_2960105012.webp)
Rise
™
Installation Guide 12
4
Place the Quartz Smart Valve
™
on a solid mounting surface, and
place the fixing feet into suitable positions. Mark, then drill and
prepare suitable fixings before securing the Quartz Smart Valve
™
to the mounting surface using the screws provided, (if suitable).
5
Flush through both hot and cold supply pipes.
Refer to safety information section
The maximum hot water inlet temperature must be no more than 65˚C.
•
!
6
Attach the supply pipes to the Quartz Smart Valve
™
, ensuring
that the cold and hot feeds are fitted into the appropriately
marked inlets.
Do not solder near to plastic components.
•
!
If you have a concealed system continue with instructions 7-12.
If you have an exposed system proceed to instruction 13.
7
Run a pipe from the mixed water outlet of the Quartz
Smart Valve
™
to the proposed siting
for the shower hose outlet, fixed head or diverter depending on the system purchased.
To ensure optimum performance use the minimum amount of elbows.
To maximise flow rates we recommend using copper pipe with the minimum amount of elbows.
•
!
8
Place the paper template on the wall in the desired location
for the controller and mark all fixing points and the data cable
entry point. Remove the template and drill a Ø16mm hole at the
appropriate position for the data cable.
Isolation valves are supplied with the Digital
processor and must be fitted on both inlets
and the blended water outlet. All pipe work
should be run in 15mm pipe. All pipe work
should be supported. For externally pumped
gravity fed installations, 22mm pipe work
should be run as close to the processor as
possible before reducing down to 15mm.
2
The inlet supply centres are 48mm. The inlet supply centres deviate from
EN1111 and EN1287, but are deemed to be a special case. Please note arrow
on isolation valve to indicate direction of flow.
Compression fittings should not be used on the inlet and outlet spigots and
may affect the warranty if fitted.
!
Place the Digital processor on a solid
mounting surface, adjusting the fixing feet
into suitable positions. Mark then drill and
prepare suitable fixings before securing the
processor to the mounting surface using the
screws provided.
4
Flush out the hot and cold supply pipes.
5
The maximum hot water inlet temperature must be no more than 65°C.
!
Quartz
Digital
Concealed with adjustable height or fixed head
90mm
445mm
270mm
350mm
265mm
70mm
To ensure safe operation and installation of this product, the processor MUST be
installed in one of the orientations shown.
1
Choose the position for your Digital processor as close to the shower control
as possible. The processor may be sited in the roof space above the proposed
shower site, in the airing cupboard or behind a screwed bath panel if more
convenient. If siting in the roof space, ensure that freezing cannot occur and
that no insulation material is placed under or over the processor. Please refer
to the system layout diagrams.
3
!
THE PROCESSOR MUST BE SITED IN A POSITION THAT IS SAFELY ACCESIBLE
FOR SERVICING AND COMMISIONING PURPOSES. WHEN FITTED IN THE
LOFT SPACE, THE ROUTE TO AND THE AREA AROUND THE PROCESSOR MUST
BE BOARDED TO ENSURE A SAFE WORKING ENVIRONMENT.
The optimum position for the Digital processor is in the roof space above the
shower site to take full advantage of the ease and speed of installation –
please refer to the note above.
The distance between the Digital processor and shower control must be within
range of the 10m data cable supplied.
Unscrew the single fixing on top of the
processor box and then carefully tilt the lid up
and off the location lugs and pull the lid clear.
15
Connect the processor power lead to a double
pole 3amp switched fused spur, incorporated
in the wiring circuit, in accordance with current
wiring rules. Ensure that this is located in an
accessible, dry location and not in the
bathroom.
14
THIS APPLIANCE MUST BE EARTHED.
We recommend protecting surface mounted cables in suitable approved
conduit to avoid the risk of damage from vermin.
The data cable and power lead should also be clipped in place with ‘P’ clips
or similar to avoid accidents.
!
BEFORE ANY ELECTRICAL ADJUSTMENT IS ATTEMPTED, THE ELECTRICITY
SUPPLY MUST BE TURNED OFF AT THE MAINS SWITCH.
ELECTRICAL INSTALLATION MAY ONLY BE CARRIED OUT BY A QUALIFIED
PERSON.
!
Connect the low voltage data cable into the
socket adjacent to the temperature adjuster
as indicated on the label. Feed the cable out
of the processor box ensuring it is correctly
routed within the data cable channel.
16
The Digital processors are supplied factory set
with the flow rate at either ‘NORMAL HP’ or
‘NORMAL GRAVITY’ mode depending on which
shower system has been ordered.
HP/COMBI PROCESSORS ON BALANCED HP
SYSTEMS:
HP/Combi Digital processors fitted to balanced
high pressure systems may be set to ‘NORMAL HP’, or for water economy,
‘ECO’ modes.
HP/COMBI PROCESSORS ON COMBINATION BOILER SYSTEMS:
For HP/Combi Digital processors installed on combi boiler systems, for
optimum performance we recommend setting the flow rate to the ‘COMBI’
mode.
19
N.B. The ‘ECO’ flow rate mode should not be selected for shower systems
fitted to combination boilers.
GRAVITY PUMPED PROCESSORS:
Gravity Pumped Digital processors fitted to gravity systems may be set to
‘NORMAL GRAVITY’, or for water economy, ‘ECO’ flow rate modes.
WHEN MAKING ANY ADJUSTMENT TO THE PROCESSOR SETTINGS THE
POWER MUST BE ISOLATED.
!
Connect the power to the processor and press the ‘Start/stop’ button on the
controller to turn the shower on. Flush the system through for 15 seconds to
clear any debris. Turn the shower off and isolate from the electricity supply.
18
Attach the supply pipes to the Digital
processor, ensuring that the cold and hot
feeds are fitted into the appropriately
marked inlets.
6
DO NOT SOLDER NEAR TO PLASTIC
COMPONENTS.
!
Run a pipe from the mixed water outlet on the Digital processor to the
proposed siting for the shower hose outlet, fixed head or diverter depending
on the system purchased.
7
Feed the control connection end of the data
cable through the centre hole in the mounting
template. Run a bead of silicone sealant in the
mastic groove on the back of the mounting
plate and press into position onto the finished
wall surface. Ensure the data cable is held
securely by the narrow middle slot of the
mounting plate and fix to the wall using the
screws provided.
10
Place the paper template on the wall in the
desired location for the shower control and
mark all fixing points and the data cable entry
point. Remove the template and drill a
Ø16mm hole at the appropriate position for
the data cable.
8
Plug the data cable into the rear of the
controller and push fully home. Slide the
controller assembly onto the mounting
plate.
11
A further data cable socket has been provided
for use with the secondary Digital remote
control or Digital diverter. This can be accessed by carefully snapping and
removing the entry pillar and connecting the cable as described above.
!
Connect the outlet pipe to the mixed water outlet on the Digital processor.
Using pipe clips as appropriate, ensure that all pipe work is perpendicular to
the processor, i.e. not putting any strain on the fittings.
13
TO ENSURE OPTIMUM PERFORMANCE USE THE MINIMUM AMOUNT
OF ELBOWS.
TO MAXIMISE FLOW RATES WE RECOMMEND USING COPPER PIPE
WITH THE MINIMUM AMOUNT OF ELBOWS.
!
This product must be installed by a competent person in accordance with
the relevant Water Supply Regulations.
In addition to the guide below, it is essential that the written instructions
overleaf are read and understood and that you have all the necessary
components (shown overleaf) before commencing installation.
The Quartz Digital shower system is supplied with universal fixings intended
to secure it to a suitable wall.
!
!
!
Ensure the data cable is the correct way round as both ends differ in type
of connection used.
!
TM
The data cable should be run in conduit to allow for replacement if required.
Care should be taken to ensure the mounting holes do not pierce the data
cable conduit.
!
If installing this Quartz Digital as a replacement shower, it may be necessary
to purchase a Digital concealed retro-fit wall plate to first cover the existing
hole in the tiling. The cavity in the wall should be plugged using a suitable
material for the wall plate controller to be secured to. Contact our Customer
Service Department to purchase product: QZD.B3.RWP.14 – Quartz Digital
concealed retro-fit wall plate.
!
Drill and prepare the four wall fixings for the controller using the fixings
provided.
9
Secure the controller onto the back plate with
the fixing screw located at the base of the
controller using a small Posidriv screw driver.
To ensure a watertight seal, we recommend
running a thin bead of silicone around the
concealed controller once the controller has
been secured onto the back plate.
12
Fit the shower head system following the separate installation
instructions provided.
17
Re-instate the electricity supply to the Digital processor. Press the ‘Start/stop’
button on the controller to turn the shower on.
20
Run the shower at maximum temperature
(factory pre set to 45°C). If required,
maximum temperature adjustment can be
made with a flat bladed screwdriver using
the ‘MAX TEMP ADJUSTMENT’ control as
indicated. When the temperature has been
set to the desired position, carefully replace
the Digital processor lid and secure the fixing hand tight only.
21
Site conditions can affect temperature settings, installer to adjust as required.
ALL COPPER PIPE WORK MUST BE CROSS-BONDED AND CONNECTED TO A
RELIABLE EARTHING POINT.
!
Shower Control User Guide
1. Turn the temperature dial to the required setting.
2. Press the ‘Start/stop’ button on the control,
to turn the shower on.
3. The blue LED display will flash until the selected temperature has been reached.
4. When the LED display is constant, step into your shower and enjoy!
5. The temperature may be adjusted once in the shower.
6. Press the ‘Boost’ button on the control to increase
the strength of the shower when desired.
N.B. If installed on a combination boiler system,
the strength of the ‘Boost’ button will depend on
the performance capablity of your combination
boiler.
7. Press the ‘Start/stop’ button on the control, to turn the shower off.
Adjustable Head User Guide
1. Rotate the spray plate lever clockwise or
anti-clockwise to select the desired spray pattern.
N.B. When the lever is in the 3 o’clock position
when viewed from below, the water saving mode
is selected. This provides the same spray pattern
as position 3, but, depending on which water
system the product is fitted to, offers up to 25%
water saving.
2. To select the preferred height for the shower head,
depress the levers fully to enable the holder to be
moved up or down the rail.
3. Angular adjustment is made by carefully but firmly
pulling forwards or pushing back the shower head
against the knuckle ratchet in the holder.
Fixed head user guide
1. The angle of the fixed shower head can be
adjusted. The shower head is mounted on a multi
directional ball joint to allow for angular
adjustment in any direction by carefully holding
the shower head and moving the head to the
desired angle.
Cleaning and maintenance
Your Quartz Digital shower system should be cleaned using only a soft cloth and
washing up liquid.
DO NOT USE ABRASIVE CLEANERS
To reduce the need for chemical descaling in hard water areas, your shower head
incorporates a ‘clear flow’ system, whereby any scale build up can be broken down
by gently rubbing the flexible tips of the jets during use. This procedure should be
completed regularly, as often as once a week in some hard water areas, as scale
build up can affect the spray pattern and cause the shower to perform poorly.
Failure to descale the shower head can affect the internal seals and may affect the
warranty.
Cleaning and maintenance should not be undertaken by children without
supervision by a person responsible for their safety.
Should chemical descaling of the head become necessary, remove the shower
head fully and immerse in a mild proprietary descalent.
!IT IS IMPERATIVE THAT DESCALING IS CARRIED OUT STRICTLY IN
ACCORDANCE WITH THE MANUFACTURER’S INSTRUCTIONS. SUBSTANCES
THAT ARE NOT SUITABLE FOR PLASTICS AND ELECTROPLATED SURFACES
MUST NOT BE USED.
Supply
Vent and draw-off
pipe to hot water
Hot water cylinder
Connect
‘A’ or ‘B’
Cold feed
to cylinder
B
A
NB: THE BASE OF THE PROCESSOR
MUST BE SITED NO HIGHER THAN
THE BASE LEVEL OF THE CISTERN
10m
max
Digital
shower
control
Supply
Pressure
reducing valve
if required
10m
max
Digital
shower
control
Supply
Hot water
cylinder
10m
max
Digital
shower
control
10m
max
Digital
shower
control
Central
heating
boiler
Supply
Supply
Vent and draw-off
pipe to hot water
Underside of cistern
Hot water
cylinder
NB: 1.5 bar MINIMUM pump rating
Cold feed
to cylinder
Connect
‘A’ or ‘B’
B
A
10m
max
Digital
shower
control
Typical combination boiler installation
(Compatible with HP/Combi processor)
Typical HP system installation
(Compatible with HP/Combi processor)
Typical thermal storage unit system installation
(Compatible with HP/Combi processor)
Typical gravity system installation
(Compatible with Gravity pumped processor)
Typical pumped system installation
(Compatible with HP/Combi processor)
!
Quartz dig concealed V3:Quartz Con Fix/Flexi 293401 1/7/15 10:12 Page 2
Ensure the data cable is the correct way round as both ends differ in type of connection used.
The data cable should be run in conduit to allow for replacement if required.
Care should be taken to ensure the mounting holes do not pierce the data cable conduit.
•
!