19
2
Where required, replace the service tunnel and secure using the fixing screw
provided.
3
Unclip the earth terminal
block and reposition it
into the holder on the
service tunnel.
4
Any cable MUST NOT
have the outer insulation
stripped back beyond the
bottom of back plate or
service tunnel (if used)
and must be protected
from water as shown.
Refer to the indicator
guide on the service
tunnel.
The service tunnel MUST NOT be cut or altered in any way.
•
!
Summary of Contents for Quartz Electric
Page 1: ...QUARTZ ELECTRIC INSTALLATION AND USER GUIDE ...
Page 35: ...35 ...