
14
4
Refer to positioning guideline diagram page 10.
Check there are no hidden cables or pipes before
drilling.
Tape the template provided onto the finished
wall surface in the desired position and mark the
required 3 fixing points. Drill and prepare the
fixings holes using the fixing kit provided,
if suitable.
Where applicable, use fixing point 2a for new
installations. Utilise fixing point 2b for like-for-like
replacements. Check backplate fixing points prior
to drilling.
5
Flush through the water supply pipe allowing it to discharge safely to waste.
6
Pipework connection must be made using a 15mm
compression elbow (not supplied) for top, bottom
or rear entry. A copper olive is supplied, located
on the shower inlet stub and should be fitted into
the compression elbow prior to the elbow being
connected.
IMPORTANT:
Do not use excessive force when
making the connection to the unit.
Rear entry.
The wall must be sufficiently chased out around the pipe and cable to
allow room for the nut on the compression elbow to be recessed into
the wall. Failure to do so will result in distorting the backplate and a poor
fitting front cover. The pipework must be connected to the elbow prior
to fitting the shower unit to the wall.
We recommend the use of a suitable sealant to seal around the incoming
pipework to prevent water entering the wall.
•
!
Summary of Contents for Quartz Electric
Page 1: ...QUARTZ ELECTRIC INSTALLATION AND USER GUIDE ...
Page 35: ...35 ...