English

3. 

CHECKS AND OPERATIONS PRIOR TO THE INSTALLATION OF THE OPERATOR

3.0     CHECKING THE GATE

•   Before proceeding with the mounting, do a complete check on the gate leaves making sure that they are in good condition and 

not broken or damaged in any way.   

•    Ensure the motion of the gate leaves is uniform and the hinges have no play and do not rub.
Otherwise, hinges must be repaired so that the gate leaves can be moved easily by hand or, if repair is impossible, hinges must 
be replaced.
•   Check that the gate leaves are plumb (when perfectly still at any point in the swing) (

B1B

); when the gate leaves are completely closed, 

check that the closure is even throughout the whole height of the gate leaves.

•   Using a dynamometer, check that the opening and closing effort of the gate, to be measured from the end of the gate leaf, does 

not exceed 15 kg (147 N).

Before deciding on the fi nal position of the mountings, it is necessary to:
•   Choose the most suitable height on the gate leaf for the operator front mounting. If possible, it should be positioned halfway up the 

gate leaf. As a rule, the ideal point is always in the strongest area where the fi xing of the gate leaf has the least effect. If there is not a 
broad strip of steel in the gate framework, then a suitable support needs to be welded on in the area where the front mounting is to be 
positioned in order to spread the load over a wide zone  (

B1A

).

•    Check whether the chosen area needs reinforcing or strengthening in any way. Make the same check on the gate leaf support posts.

16

B

A

13

1

13

2

3

4

5

7 10 9

6

10

14

8

15

15

11 12

17

B3

B4

Preliminary operations

eee eee
eee eee
x eee

............

AP030002

B1A

B1B

3.1     CHECKING THE OPERATOR COMPONENTS

Check that the model code displayed on the operator packaging 
corresponds to the code on the identifi cation plate on the operator 
itself (

B3

).

Also,before starting with the mounting procedure, check that the 
packaging contains all the components listed below (

B4

) and that 

none of them is damaged.

1 -

   Operator

2 -

   Rod protection casing

3 -

   Rod proctection casing cover

4 - 

 Rear mounting

5 -

   Bushes

6 -

  Fork 

7 -

   Rear pin

8 -

   Locknut

9 -

   Fork pin

10 - 

 Snap ring

11 - 

 Front mounting

12 - 

 Front mounting pin

13 - 

 Snap ring

14 - 

 Capacitor

15 - 

 Self-threading screw

16 - 

 Release key

17 - 

  Plate for rear mounting

A - 

  Complete front mounting assembly

B -

   Complete rear mounting assembly

PLUMMET

AP030003

Summary of Contents for ZT4 C

Page 1: ...ses 20 4 2 Fixing the rear operator mounting 21 4 3 Temporary installation of the operator 21 4 4 Positioning the front operator mounting 22 4 5 Final installation of the operator 23 4 5 1 Mechanical...

Page 2: ...n the basis of the characteristics and dimensions of the element to be operated Caution The choice of the most suitable type of automation assures an efficient operation of the unit and minimises the...

Page 3: ...the operator power cable with a sheath if necessary do this before connecting the cable to the junction boxes Warning Every operator comes complete with a pickup capacitor During installation connect...

Page 4: ...rule the ideal point is always in the strongest area where the fixing of the gate leaf has the least effect If there is not a broad strip of steel in the gate framework then a suitable support needs...

Page 5: ...SAG 285 14 7 USAG 285 17 4 INSTALLING THE OPERATOR 4 0 POSITIONING THE MOUNTINGS The following table C1 indicates the recommended data for defining the position of the operator mountings in relation t...

Page 6: ...ixing screws C4 The size of the reinforcing plate must be in proportion to the size of the column Warning If the size of the column allows for it use the Aprimatic standard plate provided 4 1 3 Operat...

Page 7: ...nsert the mesh sheaths C8 pos 3 into the holes and inject the quick dry glue C8 pos 4 see attached instructions for application method and quantity If the B type plate is used Insert the stud bolts C8...

Page 8: ...ly protected from weld residues When the welded zone has cooled down apply a coat of anti rust paint 4 3 TEMPORARY INSTALLATION OF THE OPERATOR Temporarily mount the operator to find the correct fixin...

Page 9: ...the strengthening plate is especially important with gate leaves made from thin sheet steel When cleaning the mounting zone for the operator front mounting remove the operator and protect it from fly...

Page 10: ...the movement this should be done very slowly otherwise the operators will take in air and consequently will have to be bled Open and close the gate leaf to check that the operator can move freely wit...

Page 11: ...crewdriver turn the control valves clockwise to increase the pressure and counter clockwise to reduce it Adjust both opening silver E8 pos 2 and closing pressure gold E8 pos 1 Caution The opening thru...

Page 12: ...sun for a long period with the gate closed check that the operator piston is not in the fully advanced position i e with the rod completely out Screw the pressure setting valve clockwise par 5 E8 pos...