background image

24

 -

English

Final operations

E7

Fit the protective sheath to the power supply cable (

E5

 pos. 

5

if necessary.

Caution

One drop of hydraulic oil coming out of the duct created by the 

screw elimination (E5 pos. 4) is normal. 

Information

After installation, an appropriate warning sign must be attached 

to the gate

 

(E6 pos. 2.) 

When completely assembled, the operator should appear as shown 
in the 

fi

 gure (

E6

 pos. 

1

).

4.5.5  Bleeding

Warning

!

Before proceeding in setting the operator, bleed it.

Start the operator after having checked the setting of the pressure 
relief valves and move it to stroke end either in open or close 
position.  Rotate on the key (see paragraph 

6

) and lock and unlock 

the operator a dozens of times.

5. 

CHECKS AND ADJUSTMENTS

5.0    

CHECKING AND ADJUSTING THE THRUST 

 FORCE

With the gate leaf moving, measure the thrust force at the end of the 
gate leaf, using a dynamometer (

E7

 pos. 

1

). 

The thrust force must never exceed 15 Kg (147 N). 
If necessary, adjust the working pressure of the operator.
Using a broad, flat-headed screwdriver, turn the control valves 
clockwise to increase the pressure and counter-clockwise to 
reduce it.
Adjust both opening (silver - 

E8

 pos. 

2

) and closing pressure (gold 

E8

 pos. 

1

).

Caution

•  The opening thrust of the gate leaf should be set slightly 

higher than the closing thrust.

•     After making the settings, make another check with the 

dynamometer to see if the thrust force corresponds to the 
setting; if it doesn’t, then the setting needs to adjusted 
again.

•    If the gate leaf requires an excessively high pressure to move 

it, then make another thorough check of the mechanical parts, 
the plumb and the free movement of the gate leaf itself.

6.0     EMERGENCY MANOEUVRE - USE OF THE 
MANUAL RELEASE 

AP030040

E5

E6

Ap

rim

atic

Ap

rim

   

atic

Ap

rim

   

atic

Ap

rim

atic

Ap

rim

atic

2

1

In the event of a power failure, release the operator in order to open the gate by hand. 

To gain access to the release valve, it is enough to loosen the screw  (

E9 

pos. 

2

) and open the small cover (

E9

 pos. 

3

) by rotating it.

Unlock the operator by turning the triangular key provided (

E9

 pos. 

1

) counter-clockwise.

After the operation, re-lock the operator by turning the key clockwise. 

Warning

!

After locking and releasing operations, remember to re-close the cover.

Summary of Contents for ZT4 C

Page 1: ...ses 20 4 2 Fixing the rear operator mounting 21 4 3 Temporary installation of the operator 21 4 4 Positioning the front operator mounting 22 4 5 Final installation of the operator 23 4 5 1 Mechanical...

Page 2: ...n the basis of the characteristics and dimensions of the element to be operated Caution The choice of the most suitable type of automation assures an efficient operation of the unit and minimises the...

Page 3: ...the operator power cable with a sheath if necessary do this before connecting the cable to the junction boxes Warning Every operator comes complete with a pickup capacitor During installation connect...

Page 4: ...rule the ideal point is always in the strongest area where the fixing of the gate leaf has the least effect If there is not a broad strip of steel in the gate framework then a suitable support needs...

Page 5: ...SAG 285 14 7 USAG 285 17 4 INSTALLING THE OPERATOR 4 0 POSITIONING THE MOUNTINGS The following table C1 indicates the recommended data for defining the position of the operator mountings in relation t...

Page 6: ...ixing screws C4 The size of the reinforcing plate must be in proportion to the size of the column Warning If the size of the column allows for it use the Aprimatic standard plate provided 4 1 3 Operat...

Page 7: ...nsert the mesh sheaths C8 pos 3 into the holes and inject the quick dry glue C8 pos 4 see attached instructions for application method and quantity If the B type plate is used Insert the stud bolts C8...

Page 8: ...ly protected from weld residues When the welded zone has cooled down apply a coat of anti rust paint 4 3 TEMPORARY INSTALLATION OF THE OPERATOR Temporarily mount the operator to find the correct fixin...

Page 9: ...the strengthening plate is especially important with gate leaves made from thin sheet steel When cleaning the mounting zone for the operator front mounting remove the operator and protect it from fly...

Page 10: ...the movement this should be done very slowly otherwise the operators will take in air and consequently will have to be bled Open and close the gate leaf to check that the operator can move freely wit...

Page 11: ...crewdriver turn the control valves clockwise to increase the pressure and counter clockwise to reduce it Adjust both opening silver E8 pos 2 and closing pressure gold E8 pos 1 Caution The opening thru...

Page 12: ...sun for a long period with the gate closed check that the operator piston is not in the fully advanced position i e with the rod completely out Screw the pressure setting valve clockwise par 5 E8 pos...

Reviews: