2695 Series Operation Manual
EZT-2695-8000/1
Page
18
of
124
5. Operation
Power Up
•
Ensuring software is installed and connections are made as Section 4; the Easytrak Nexus
Lite can be powered up.
•
Switch the main power button on the rear panel. The PWR LED will indicate green.
•
Launch the Easytrak Nexus Lite Application.
•
The system will automatically detect the 2695 Console and set the configuration to the
selected setup.
•
To power down the system close the Nexus Lite Application and power down the 2695
console.
Front Panel Indicators
•
PWR will indicate Green when Nexus Lite Unit is powered ON.
•
TRANS will indicate Green when power is ON to the Transceiver.
•
TX / RX will indicate Green upon a beacon interrogation and valid reply received.
•
SERIAL 1,2,3,4 will flash Green indicating valid activity on the serial ports.
Summary of Contents for Easytrak Nexus Lite 2683
Page 1: ...Easytrak Nexus Lite 2695 Series Operation Manual ...
Page 13: ...2695 Series Operation Manual EZT 2695 8000 1 Page 13 of 124 ...
Page 85: ...2695 Series Operation Manual EZT 2695 8000 1 Page 85 of 124 Summary Report ...
Page 86: ...2695 Series Operation Manual EZT 2695 8000 1 Page 86 of 124 Complete Listing of Dataset ...
Page 88: ...2695 Series Operation Manual EZT 2695 8000 1 Page 88 of 124 ...
Page 89: ...2695 Series Operation Manual EZT 2695 8000 1 Page 89 of 124 ...