Step 4.
Connect the Master unit
RF OUTPUT
and
the Slave unit
RF OUTPUT
to the appro-
priate connections on the DUT.
Initiating
Master-Slave
Operation
The following paragraphs describe how to set up
both instruments to perform master-slave opera-
tions. Use the CW Frequency Mode menu map (Fig-
ure 4-2, page 4-6) to follow the menu sequences.
To initiate master-slave operation, turn on both in-
struments and place them in CW mode. The CW
menu (below) is displayed.
On the Master unit, press
Master Slave >
to access
the Master-Slave menu display (below).
This menu lets you perform the following:
q
Access the Slave Frequencies List menu
q
Set the delta frequency for the Slave unit
q
Set the Slave unit's main power level (L1)
q
Set the alternate sweep power level (L2) for
the Slave unit
q
Turn master-slave operation on and off
Press
Slave Freqs...
to access the Slave Frequencies
List menu (following page).
Use With Other Instruments
Master-Slave Operation
MG369XB OM
7-5
NOTE
Master-slave operations are always
initiated in the CW frequency
mode. Once initiated, you then can
change to a sweep frequency mode
of operation by selecting the de-
sired frequency mode on the Master
instrument.
Summary of Contents for MG369 Series
Page 3: ......
Page 4: ......
Page 14: ...1 2 MG369XB OM Figure 1 1 Series MG369XB Synthesized Signal Generator ...
Page 20: ......
Page 22: ......
Page 38: ......
Page 154: ......
Page 156: ......
Page 158: ......
Page 174: ......
Page 214: ......
Page 216: ......
Page 230: ......
Page 232: ......
Page 260: ......
Page 262: ......
Page 268: ......