background image

000-015-480 Issue 5 

22

nd

 May 2017 

Anite S-CORE Getting Started Guide 

Page 14 of 47 

Commercial In Confidence 

3.1.1

 

TP-Link Router Setup 

 

Cabling Instructions 

Connect the cables for the S-CORE test system using a pre-configured TP-Link router as follows: 

1. 

Use an RF cable to connect the Device Under Test (or an Antenna Coupler) to the RF Port 1A 
(section 2.1 [12]) on the front of the S-CORE Connect unit. 

2. 

Optionally, connect a VGA Cable to the back of the S-CORE unit (section 2.1 [26]) and into a 
monitor to display the S-CORE Monitor GUI, which is useful for troubleshooting. For more 
information, see section A1. 

3. 

Connect one end of two LAN cables to the LAN Port 1 (section 2.1 [17]) and LAN Port 2 (section 
2.1 [24]) connections on the back of the S-CORE

 

unit, and connect the other ends of the LAN 

cables to Ethernet ports on the back of the TP-Link Router (section 2.2 [4]).  

Note:

 It is important to connect both LAN cables before using the system. 

4. 

Connect a LAN cable from the Ethernet port [4] on the back of the TP-Link Router to the network 
card in the back of the Test System PC. 

5. 

Connect the S-CORE to mains using a three-prong AC power cord and into a grounded power 
socket. The power input connector (type IEC 322) is located on the back of the unit (section 2.2 
[30]). 

Note:

 Once the power input connector is switched on, you must not remove the power cable or 

switch the power input connector to the off position when turning off the unit. Always use the 
power button on the front of the S-CORE Connect unit. 

6. 

Press the power button (section 2.1 [8]) on the front panel of the S-CORE to switch it on and the 
Power LED Indicator will start blinking green. This means that the system is booting up. 

When the system is up, the Power LED Indicator is green and the Status LED (section 2.1 [2]) 
will be green. 

IP Address Configuration 

Configure the LAN port of your PC to obtain IP Address automatically so that the IP Address of your 
PC will be assigned automatically by the DHCP server of the TP-Link Router as follows: 

1. 

Display the network connections form Start > Control Panel > Network and Internet > Network 
Connections. 

2. 

Right-click on the network connection for the TP-Link router and select 

Properties

.  

3. 

Select 

Internet Protocol Version 4 (TCP/IPv4)

 from the list of items used by the connection 

and click 

Properties

Summary of Contents for S-CORE

Page 1: ...uy your excess underutilized and idle equipment along with credit for buybacks and trade ins Custom engineering so your equipment works exactly as you specify Critical and expedited services Leasing R...

Page 2: ...WWW ANITE COM Keysight Technologies 2012 2017 Commercial in Confidence ANITE S CORE APPLICATION TESTING GETTING STARTED GUIDE 22ND MAY 2017 000 015 480 ISSUE 5...

Page 3: ...the Anite Help Desk and to download the latest software releases please log in to myKeysight On the myKeysight home page in the Quick Links box click the link for the Anite Help Desk or click Keysight...

Page 4: ...ing The S CORE GUI 16 3 4 Updating software packages 17 3 5 Installing the S CORE External RF Controller 18 4 START TESTING USING S CORE 20 5 CONTROLLING RADIO ACCESS TECHNOLOGIES FROM THE GUI 25 5 1...

Page 5: ...TP Link Router IP Address 46 APP B GLOSSARY 47 Table 1 Front view panel 6 Table 2 Rear view panel 8 Table 3 TP Link Router panel 10 Table 4 Anite WLAN Test Accelerator panels 11 Table 5 Test System P...

Page 6: ...one test platform with an integrated LTE IMS radio and network subsystem and it includes an application test suite a rich and fully featured user interface and a wide portfolio of test case packages e...

Page 7: ...tor LED green indicates that a session has been established with an external connection The LED will be green as long as the session remains connected LED off indicates that no session has been establ...

Page 8: ...ce use 8 Power Button with LED Indicator Power on off switch LED off indicates that the test system has no power LED red indicates that the test system is in standby mode LED blinking green indicates...

Page 9: ...nd signal trigger output 16 Trigger 1 I O LAN Ports 17 LAN Port 1 RJ 45 connection type for connecting S CORE test system with the TP Link Router or WLAN Test Accelerator Others 18 Status LEDs Display...

Page 10: ...Router or WLAN Test Accelerator Others 25 Two USB Ports Used for connecting to the external devices 26 VGA Video Output Video output for connecting monitor with S CORE 10MHz Reference Connectors 27 10...

Page 11: ...Holding down this button for 5 to 10 seconds will reset the wireless router back to the default TP Link factory settings It is recommended to contact support team before resetting router 3 LAN RJ 45...

Page 12: ...g table Table 4 Anite WLAN Test Accelerator panels Button Port Description Power button To power the unit into and out of standby mode The button lights up when power is supplied to the unit The colou...

Page 13: ...ORE test system Table 5 Test System PC requirements Item Requirement Adobe Flash Player Version 10 3 Processor Dual Core CPU Recommended Speed 2 5GHz Memory 2GB of RAM or higher Available Hard Disk Sp...

Page 14: ...s section describes how to connect the S CORE unit Test System PC and WLAN Router TP Link Router or Anite WLAN Test Accelerator The S CORE test system can be configured using either a TP Link Router o...

Page 15: ...of the Test System PC 5 Connect the S CORE to mains using a three prong AC power cord and into a grounded power socket The power input connector type IEC 322 is located on the back of the unit section...

Page 16: ...2 3 Note It is important to connect both LAN cables before using the system 4 Connect a LAN cable from the Ethernet port 4 on the back of the WLAN Test Accelerator to the network card in the back of t...

Page 17: ...PC as follows If Keysight provided the test system PC it will have Windows 7 with the latest updates and patches installed If you are using your own test system PC ensure that you have taken equivalen...

Page 18: ...ould lead to abrupt power loss which may cause file system errors 3 4 Updating software packages Updating or installing new software packages can be performed in two different methods depending if the...

Page 19: ...lation of the package you will be notified Reboot the system after 3 minutes to make sure installation of packages is ready 3 5 Installing the S CORE External RF Controller The Anite External RF Contr...

Page 20: ...to select the Destination folder to which the application extracts the required files The location must be set to one of the following C Program Files x86 Anite S CORE Macros for 64 bit Windows PCs C...

Page 21: ...and password The default Application Server IP Address Username and Password are listed below IP Address 10 23 205 xx IP of your Application Server Username admin Password Fen8Geng xx are the last tw...

Page 22: ...ing Started Guide Page 21 of 47 Commercial In Confidence The applications available will be highlighted depending on the purchased packages Select the application you wish to test by pressing the Star...

Page 23: ...Commercial In Confidence Enter application specific settings as required in application option window E g VOIP Options Network Type SCORE LTE Core Network Address 10 23 204 xx IP of signalling card P...

Page 24: ...h to run from the list indicated as shown in this screen shot then click on the Add to campaign button Click on Close to go to the next screen In the main S CORE GUI user can switch on the RAT GERAN W...

Page 25: ...which displays the PICS Pool window b On the PICS Pool window select the PICS file to use and click Set Active PICS c Click Close to close the dialog 2 Select the required test cases to run then clic...

Page 26: ...ADIO ACCESS TECHNOLOGIES FROM THE GUI The three RATs available on the S CORE GERAN LTE FDD and WCDMA can easily be controlled from the S CORE GUI They can be found exactly under the Views Bar by right...

Page 27: ...ular RAT click on the OFF button 5 2 RF sub system setup The test system needs setting up for the expected RF Power levels This setup should be as accurate as possible The most important parameters ar...

Page 28: ...ly before switching on the RF cell The following sections display the Settings Options Windows for the three available RATs GERAN WCDMA and LTE Note Specifying an RF value that is too low can lead to...

Page 29: ...ownlink reference power Lower default values when connecting directly DUT with the S CORE When setting the downlink reference power use a value for a good radio connection We recommend 30dBm as a plau...

Page 30: ...uide P CSCF IP Address Application Server IP Address Refer to the System Configuration Document For detailed information about the settings please refer to the Anite S CORE Application Testing Operati...

Page 31: ...good starting point would be 25 dBM according to 3GPP TS 36 101 a class 3 UE should be set to 23dBm 2dB The Rx Power should be set to the maximum possible power level and it is better to specify a sl...

Page 32: ...attenuation that is slightly too low rather than too high Specifying a value that is too high can lead to a Layer 1 system error which requires the S CORE unit to be re booted EPS Attach Type Based o...

Page 33: ...000 015 480 Issue 5 22nd May 2017 Anite S CORE Getting Started Guide Page 32 of 47 Commercial In Confidence PDN2 PDN4 tab...

Page 34: ...n MS IP Address IP for mobile it should be configured in the same subnet as the S CORE For more information see the Anite S CORE Application Testing System Configuration Guide AP Name Please set the A...

Page 35: ...tings Setting Description MCC MNC Mobile Country Code and Mobile Network Code that RAT will broadcast K value IMSI Information of test SIM card Refer to the System Configuration Document RAND 16 bytes...

Page 36: ...alues when connecting directly to Device Under Test UL Reference Power Uplink reference power MS IP address IP for mobile it should be configured in the same subnet as the S CORE DNS IP address User c...

Page 37: ...age backup the existing LTE cell settings of the single cell RF stack as follows 1 Log in to the S CORE GUI 2 Right click on LTE Cell and select Settings of 1 3 Click Export and save the settings to a...

Page 38: ...arted Guide Page 37 of 47 Commercial In Confidence 4 Click Upgrade to display the Instrument Upgrade screen below 5 Click Browse and select the S CORE RF Stack Packager executable file downloaded in s...

Page 39: ...e log in to S CORE GUI Now two cell options Cell1 and Cell 2 can be seen in S Core GUI To configure and enable the LTE cells 1 Right click on the first cell and select Technology LTE FDD LTE FDD as sh...

Page 40: ...Cell1 settings 5 Import the sample file in the S CORE GUI and modify the following settings The serial number of the S Core unit Uplink and downlink power levels Path losses 6 When complete click Appl...

Page 41: ...ported directly for cell settings in multicell RF stack They need to be updated manually 6 5 RF connection for multicell test cases Connect both RF output 1A and 1B from front panel of S CORE to UE wh...

Page 42: ...cells as shown below 3 Apply the changes to the cell before switching it on as follows a Right click on the RF cell and click Settings to display the RF settings dialog b Click Apply to save the chan...

Page 43: ...ch Tracer button on the toolbar This will open a separate logging window which traces the lower layer messages You will be able to view the message exchange in two views one as simple list view and th...

Page 44: ...matically with start of test case and RF logs saved with test case logs in same folder To enable automatic RF tracing 1 Click on Local Options 2 Display the Ext Tools2 tab 3 Select the Auto Start Trac...

Page 45: ...e displayed in above example LTE_VZW VoWiFi 05 15_2017_04_03_14_02_59 The log is then displayed in the window as shown below 7 4 Collecting Service Logs Service logs are used by Customer Support for a...

Page 46: ...tting Started Guide Page 45 of 47 Commercial In Confidence APP A APPENDIX A1 S CORE Monitor GUI The following GUI is displayed on the monitor connected with the S CORE Using the monitor is optional It...

Page 47: ...logged in click on the Network tab then the DHCP and DNS sub tab from the menu 4 Scroll down and click on Static Leases 5 Modify each of the listed IP Addresses as required Here is a configuration ex...

Page 48: ...Service GSM Global System for Mobile Communications GUI Graphical User Interface I O Input Output IMSI International Mobile Subscriber Identity IP Internet Protocol LAN Local Area Network LED Light Em...

Page 49: ...uipment Have surplus equipment taking up shelf space We ll give it a new home Learn more Visit us at artisantg com for more info on price quotes drivers technical specifications manuals and documentat...

Reviews: