104
Issue 2 14/07/16
10 Appendix
Step 13. Upon completion of inspection or subsequent
replacement, reinstall anode rods into water heater.
Step 14. Check for leaks.
Step 15. Reinstall collector cover & insulation over collector
cover.
Step 16. Reinstall jacket head, flue damper and draft diverter.
Reconnect venting.
Step 17. Reconnect plumbing connection to top of water heater
if required.
Step 18. Restore water supply and power to water heater.
Step 19. Verify proper operation.
Summary of Contents for 24/39
Page 1: ......
Page 112: ...112 Issue 2 14 07 16 ...
Page 113: ...Issue 2 14 07 16 113 ...
Page 114: ...114 Issue 2 14 07 16 ...