The pipework fitted to the tundish outlet should be at least
28mm diameter and should be terminated at a suitable drain
(see Building Regulations Approved Document G3).
All fittings and materials must be suitable for use with drinking
water and listed in the current Water Research Centre
"Materials and Fittings Directory".
Installation of unvented hot storage water systems must comply
with Part G of Schedule 1 of the Building Regulations.
Typical water service layout for Standard Range single
heater unvented system is shown in Fig 11.
Typical water service layout for Standard Range multiple
heater unvented system is shown in Fig 12.
30
Issue 2 14/07/16
3
Installation
Fig. 11
Fig. 12
Terminal
Terminal
See table (page 9)
Roof
Roof
Split flue clamp
Split flue clamp
Split flue clamp
To drain
To drain
To drain
Cold water
take-off
Cold water
take-off
Cold water
inlet
Cold
water
inlet
Hot water
service
Hot water
service
Secondary
return
via tee
Secondary return
D4/D6
84/87
only
D4/D6
84/87
only
D4/D6
84/87
only
D3
D3
D1
D1
D3
D1
D2
D2
D2
D4
D6
D4
D6
D4
D6
D5
D5
D5
Summary of Contents for 24/39
Page 1: ......
Page 112: ...112 Issue 2 14 07 16 ...
Page 113: ...Issue 2 14 07 16 113 ...
Page 114: ...114 Issue 2 14 07 16 ...