ACG+
Service & Troubleshooting Manual
Int. Approved
Document ref: P0149-825-00
October 2022
Page 14 of 37
Copyright © 2022 Analox Ltd. All Rights Reserved.
Commercial in Confidence
3]
Using a terminal screwdriver push down the clamp release button to release the clamp
and gently pull the cell wire from the clamp. Repeat this for both the red and black
wires.
4]
Unscrew the green locking ring from the chimney of the cell housing and remove from
the enclosure lid.
5]
Fit the new cell in to the enclosure lid and secure in place using the locking ring.