background image

AMPEON AMP-Series

~8~

Figure 7: Wiring terminals in the control box

Figure 8: Electric wiring of the power board

2.1 Electric wring - J0 of the control box

a) Terminal 1 and terminal 2 are the power input AC220V, terminal 3 is earthing.

Summary of Contents for AMP-EE01

Page 1: ...Ver1 91 2013 10 13...

Page 2: ...vice office of our company 3 Jiangsu Ampeon Electronic Engineering Co Ltd provides services of the three guarantee period 18 months from the delivery date 4 Troubles due to lightening strike water inv...

Page 3: ...c wiring of the main board to the spark detectors 10 2 5 Electric wiring of the control box to the diverter 10 2 6 Earthing and safety 11 C Using of the control panel 11 1 The instruction of LCD Displ...

Page 4: ...s in pneumatic transport systems for textile fibers Intelligent identification of metals kinds moving speed to ensure reliable elimination Self monitoring of actuator valve actuation time Automatic re...

Page 5: ...nstalling 1 1 The installation of the connecting pipe of spark detectors A Spark detectors B X95 junction box C Flange D Observation window Figure 1 The connecting pipe of spark detectors The connecti...

Page 6: ...s electric motor transformer and fluorescent lamp etc Furthermore it should keep a certain distance from big moving metal object The cables with big current should be also kept a distance from the det...

Page 7: ...inlet and outlet Because the diverter adopts the fast reaction pneumatic mechanism 600 800kPa stable and clean compressed air must be provided The photoelectric switch is used to be a level sensor It...

Page 8: ...time taken by diverter to reach activated position after receiving a switching impulse The range of the Safety factor is 1 2 1 3 The I in the following figure 5 is a piece of connection pipe it shoul...

Page 9: ...tric wiring X95 Spark Detectors Junction Box X90 Metal Detector Junction Box X98 Diverter Junction Box E Control box MSD 01 Figure 6 a Electric wiring of the standard installation Figure 6 b Electric...

Page 10: ...ies 8 Figure 7 Wiring terminals in the control box Figure 8 Electric wiring of the power board 2 1 Electric wring J0 of the control box a Terminal 1 and terminal 2 are the power input AC220V terminal...

Page 11: ...agnetic valve of the diverter 2 2 Electric wring J13 of the control box a Terminal 92 terminal 93 and terminal 94 a voltage free contact is provided that can be use to monitor the function status of t...

Page 12: ...X95 The wiring terminals No 32 to No 37 on the main board in the control box are connected to the terminals of the spark detector junction box X95 2 5 Electric wiring of the control box to the diverte...

Page 13: ...rhauling please first shut down the power supply and interrupt the compressed air supply The temperature of the radiator is very high So don t touch it to avoid burn c After the fire alarm is activate...

Page 14: ...yed after the keyboard locked Table 1 Instructions of the main page The Operation LED should always light up during operation It will not light up for a while when the metal is detected If it does not...

Page 15: ...park 2 Fire The record of fire alarm is twice Table 2 Explanation on the fire alarm display 3 Pressing the key FUN press FUN under the state of key locked to enter into the Parameter setting menu see...

Page 16: ...ter pressing the key FUN on the main menu page you will turn to the menu page of Parameter setting Figure 14 Parameter settings main menu When the cursor is flashing in the 1 1 Real time set item pres...

Page 17: ...at we can lock the keyboard now pressing the key to select ON or OFF 3 When the cursor is flashing in the 3 Auto RST item shows that we can press the key to enable or disable the Auto RST When the Aut...

Page 18: ...ctuated Use the key can set the parameter The setting precision of the activate parameter is 0 01S and the setting range is 0 00S 3 00S If press for 3 seconds simultaneously the data would change cont...

Page 19: ...the same time the diverter actuated and the Relay 1 is activated They would reset automatically 2 3seconds later When the cursor flashes in the second item of Spark SD2 press key and the test lamp wil...

Page 20: ...on the main board see figure 9 When the cursor flashes in NO 5 5 com set item in parameter setting menu you can enter into to the Communication setting page by press FUN simultaneously Figure 20 Comm...

Page 21: ...from registers Command message Response message 3 4 Address list Status monitor Read only 0000H bit0 1 metal is in action bit1 1 the hopper is full bit7 1 Chinese 0 English bit8 1 detected the spark b...

Page 22: ...he spark alarm function should be checked regularly with simulation test to assure that they are in the good working status It is suggested that the test be carried out at least once every two weeks T...

Page 23: ...verter actuated but you can t find the test metal in the collecting box you should carefully observe and repeatedly adjust Activate and reset parameter until you can reliably divert the test metal In...

Page 24: ...AMPEON AMP Series 22...

Reviews: