Model 415
Operation Manual
7.
At this point, operations can begin.
NOTE
After the system is turned on, and cabling is connected for the first time, some of the cooling
system reservoir contents will be used to fill the cooling cables. Sometime after initial turn on
be sure to check the reservoir level and add coolant mixture again.
NOTE
During the first production run of M-415s there were two (2) types of transformers offered by AMI.
If your Power Supply was manufactured before January 1999 the below figure may be used for
Transformer terminal setup.
INTERNATIONAL TRANSFORMER TERMINAL JUMPER SET UP
200 VOLT TERMINAL JUMPER SETTINGS
Document No. 740084
Revision N
18
12 11 10
9
W1
8 7 6
5
V1 4 3 2
1
U1
220 VOLT TERMINAL JUMPER SETTINGS
12 11
10
9 W1 8 7
6
5 V1 4 3
2
1 U1
380 VOLT TERMINAL JUMPER SETTINGS
12
11
10 9 W1 8
7
6 5 V1 4
3
2 1 U1
415 VOLT TERMINAL JUMPER SETTINGS
12
11 10 9 W1
8
7 6 5 V1
4
3 2 1 U1
DOMESTIC USA TRANSFORMER TERMINAL JUMPER SET UP
230 VOLT TERMINAL JUMPER SETTINGS
12 11 10
9
W1
8 7 6
5
V1 4 3 2
1
U1
240 VOLT TERMINAL JUMPER SETTINGS
12 11
10
9 W1 8 7
6
5 V1 4 3
2
1 U1
440 VOLT TERMINAL JUMPER SETTINGS
12
11
10 9 W1 8
7
6 5 V1 4
3
2 1 U1
480 VOLT TERMINAL JUMPER SETTINGS
12
11 10 9 W1
8
7 6 5 V1
4
3 2 1 U1
FIGURE 2A
Summary of Contents for 415
Page 1: ...MODEL 415 OPERATION MANUAL Document No 740084 Revision N ...
Page 19: ...Model 415 Operation Manual Document No 740084 Revision N 14 ...
Page 24: ...Model 415 Operation Manual Document No 740084 Revision N 19 ...
Page 25: ...Model 415 Operation Manual Document No 740084 Revision N 20 ...
Page 34: ...Model 415 Operation Manual Document No 740084 Revision N 29 ...