A01-00159 Rev B
10
2.0 INSTALLATION AND SETUP
NOTE:
Before installation, please inspect the unit. Be sure that nothing
inside the package is damaged. Please keep the original package in
a safe place for future use.
2.1 Rear panel view
Tower Models NEMA Type
2K
3K
1. Programmable outlets: connect to non-critical loads.
2. Output receptacles: connect to mission-critical loads.
3. AC input
4. Network/Fax/Modem surge protection
5. USB communication port
6. RS-232 communication port
7. SNMP intelligent slot
8. Emergency power off function connector (EPO)
9. Battery Jumper