![Ametek PCD 8 S Series Manual Download Page 11](http://html1.mh-extra.com/html/ametek/pcd-8-s-series/pcd-8-s-series_manual_2931379011.webp)
AMETEK CTS
PCD 8 s-series
Operating Manual
V 2.02
11 / 53
3.2.3. Assembling of the PCD 8 s-3-690-1000-100/-200
Prepare the test setup conform to the chosen standard and put both decoupling network units, etc. to the place
where the CDN shall be used for testing.
Mounting of the common earth rails
Place the two surge decoupling networks in parallel to each other. Looking from the top, make sure that the N-L1
network is below the L2-L3 network.
NOTE
To enable proper synchronization assure that L1 being placed next to L2!
Use the delivered isolated Allen key to screw the copper earth rails on to both ends of the decoupling networks (2
x 2 screws each side per network).
NOTE Make sure that the copper rail is properly mounted and tightened. Use only the delivered
screws.
After mounting the earth rails it should look like this:
Summary of Contents for PCD 8 S Series
Page 37: ...AMETEK CTS PCD 8 s series Operating Manual V 2 02 37 53 ...
Page 39: ...AMETEK CTS PCD 8 s series Operating Manual V 2 02 39 53 9 2 IEC coupling Line to Line 18 µF ...
Page 43: ...AMETEK CTS PCD 8 s series Operating Manual V 2 02 43 53 9 6 Optional ANSI coupling 1 5 Basic ...
Page 44: ...AMETEK CTS PCD 8 s series Operating Manual V 2 02 44 53 9 7 Optional ANSI coupling 2 5 Basic ...
Page 52: ......
Page 53: ...AMETEK CTS PCD 8 s series Manual of operation V 1 00 53 53 ...