Introduction
AQUATRAN 3/38 Operator’s Manual
1-4
Revision G
MOCON, Inc.
At some point sufficient measurements will have been made to accurately determine the transmission rate
of the samples. A Permeation Test can be terminated manually by the user, after a fixed number of test
cycles or using an automatic convergence process. When testing is complete, the cell is removed from the
test sequence and no further transmission rate examination of that sample is performed. For more
information on stopping a transmission rate test see “Determining When to Stop a Test” in Chapter 3.
Report Generation
You can request a report for one cell or any cell at any time until a new permeation test is started. See the
instrument Help System for information on printing reports.