Installation and Start-Up
|
3-19
Connect the conductors that supply power and a ground source from
the Sample Probe to the appropriate terminals on the Temperature
Controller.
Connect the Sample Probe RTD wires to the appropriate terminals on
the Temperature Controller.
3. Complete the wiring from the analyzer to the Terminal Block in the
Probe Heater Junction Box (see Figure 3-3).
Tighten the screws to secure each wire to the appropriate Terminal
Block location in the Junction Box.
The procedure is complete.
Summary of Contents for ASR900
Page 16: ...1 4 Heated Acid Gas Sample Probe Large Diameter Figure 1 2 HAG Sample Probe assembly drawing...
Page 25: ...Specifications 2 5...
Page 26: ...2 6 Heated Acid Gas Sample Probe Large Diameter...
Page 27: ...Specifications 2 7...
Page 28: ...2 8 Heated Acid Gas Sample Probe Large Diameter...
Page 29: ...Specifications 2 9...
Page 52: ...3 22 Heated Acid Gas Sample Probe Large Diameter This page intentionally left blank...
Page 59: ...Maintenance 4 7 Figure 4 1 Large Diameter Heated Acid Gas Sample Probe Assembly...
Page 80: ...4 28 Heated Acid Gas Sample Probe Large Diameter This page intentionally left blank...
Page 86: ...6 2 Heated Acid Gas Sample Probe Large Diameter Heated Acid Gas Sample Probe Assembly 100 2196...
Page 89: ...Drawings 6 5 Fiber Filter Assembly 100 2194...
Page 90: ...6 6 Heated Acid Gas Sample Probe Large Diameter This page intentionally left blank...
Page 92: ...S 2 Heated Acid Gas Sample Probe Large Diameter This page intentionally left blank...