Installation and Start-Up
|
3-3
Pre-Installation Requirements
Storage Prior to Installation
If the HAG Probe is stored for any period of time prior to installation,
store the equipment in an environment where it is not subject to dripping
or splashing liquids, corrosive gases, high humidity, or excessive heat or
cold. Recommended storage conditions include:
Temperature: 0 °C to 50 °C (32 °F to 122 °F)
Relative Humidity: < 70 %
Failure to comply with these storage conditions will void your warranty.
Uncrating and Inspecting the HAG Sample Probe
The Probe Heater Assembly is shipped detached from the Sample Probe
Assembly. This allows for easier installation of the equipment. Upon re-
ceiving the Sample Probe and the Probe Heater assemblies, remove them
from their shipping crates and examine their exteriors for any obvious
damage.
Tools and Equipment Required
• Set of open-end wrenches for fittings.
• Set of metric hexagonal wrenches.
• Set of metric ball drivers.
• Wire cutters, strippers, and crimpers.
• Flat blade instrument screwdriver.
• High temperature thread lubricant (must not contain copper).
• Detergent-based leak detector (Snoop
®
or another suitable leak detec-
tion agent is permissible).
• A supply of 316 stainless steel 1/4
"
O.D. tubing for the Calibration and
Aspirator Drive Air lines (unless they are integrated in the Sample
Line).
Supplied by customer/end user.
Summary of Contents for ASR900
Page 16: ...1 4 Heated Acid Gas Sample Probe Large Diameter Figure 1 2 HAG Sample Probe assembly drawing...
Page 25: ...Specifications 2 5...
Page 26: ...2 6 Heated Acid Gas Sample Probe Large Diameter...
Page 27: ...Specifications 2 7...
Page 28: ...2 8 Heated Acid Gas Sample Probe Large Diameter...
Page 29: ...Specifications 2 9...
Page 52: ...3 22 Heated Acid Gas Sample Probe Large Diameter This page intentionally left blank...
Page 59: ...Maintenance 4 7 Figure 4 1 Large Diameter Heated Acid Gas Sample Probe Assembly...
Page 80: ...4 28 Heated Acid Gas Sample Probe Large Diameter This page intentionally left blank...
Page 86: ...6 2 Heated Acid Gas Sample Probe Large Diameter Heated Acid Gas Sample Probe Assembly 100 2196...
Page 89: ...Drawings 6 5 Fiber Filter Assembly 100 2194...
Page 90: ...6 6 Heated Acid Gas Sample Probe Large Diameter This page intentionally left blank...
Page 92: ...S 2 Heated Acid Gas Sample Probe Large Diameter This page intentionally left blank...