![Amazone KE 2501 Special Operating Manual Download Page 97](http://html1.mh-extra.com/html/amazone/ke-2501-special/ke-2501-special_operating-manual_2919764097.webp)
Initial operation
KE/KX/KG (RIGID) BAH0089-7 02.2020
97
6.6
Attaching the lifting frame (specialised workshop)
Before start-up, check with the tractor rear window open whether
parts of the lifting frame collide with the rear window.
Connecting the hydraulic line of the lifting frame to the hydraulic sys-
tem for the tractor lower links brings advantages
When actuating the tractor lower link,
first, the seed drill is raised over the roller. This reduces the re-
quired lifting power of the tractor lower links.
the implement combination (with reduced lifting power require-
ment) is lifted by the tractor lower links.
To do this, it is necessary to install an additional hydraulic coupling in
the tractor (specialist workshop).
Summary of Contents for KE 2501 Special
Page 71: ...Structure and function KE KX KG RIGID BAH0089 7 02 2020 71 Fig 43...
Page 171: ...Cleaning maintenance and repair KE KX KG RIGID BAH0089 7 02 2020 171...
Page 172: ...Notes 172 KE KX KG RIGID BAH0089 7 02 2020 13 Notes Space for your notes...