Putting into operation
Citan BAG0014.4 09.14
67
6
Putting into operation
In his chapter you will find information for putting your machine into
operation.
Danger!
•
Before putting the machine into operation ensure that the
operator has read and understood the instruction manual.
•
Before hitching the machine on or off read the chapter "
Safety advice for the operator ", page 25
ο
Coupling and uncoupling the machine
ο
Transport of the machine
ο
Operation of the machine
•
Take account to these effects and allow sufficient steering
and braking of your tractor!
•
If necessary use ballast weights!
•
When mounting of machines at the front and/or in the rear
do not exceed
ο
the permissible tractor total weight
ο
the permissible tractor axle loads
ο
the permissible tyre carrying capacity of the tractor
tyres
•
Before starting to operate the combination tractor/mounted
implement, carefully determine the actual values for:
ο
the tractor total weight
ο
the tractor axle loads
ο
the tyre carrying capacity
ο
the minimum ballast
(by calculating or weighing the tractor-implement combina-
tion)
For this please refer to chapter "Determining the actual val-
ues for the tractor total weight, tractor axle loads, tyre carry-
ing capacity as well as the required minimum ballast
weights", page 68.
•
The tractor must provide the prescribed brake lag for the
laden combination according to the national legal traffic
regulations.
•
Tractor and machine must correspond to the local and na-
tional legal traffic regulations.
•
Both, the vehicle owner and operator are responsible for
adhering to the legal traffic rules.
•
Observe the max. payload of the mounted or trailed ma-
chine and the axle loads of the tractor. If necessary travel
with only partly filled hopper.
•
Before any transport travel secure the control lever of the
three point hydraulics against unintended lifting or lowering
of the mounted or trailed machine.