Maintenance, repair and care
Citan BAG0014.4 09.14
123
12.3
Maintenance and care - Review
•
Carry out maintenance in the shortest mentioned intervals.
●
Give priority to the intervals, running times and maintenance
intervals stated in the possibly provided documentation of other
manufacturers.
Maintenance before operation
Maintenance before opera-
tion
Workshop work Checking the hydraulic hose lines
Seite 124
Checking the oil level in the Vario
gearbox.
Seite 136
Workshop work Checking whether the tramline
which has been adjusted in the
distributor head corresponds to the
track width of the husbandry tractor.
Seite 133
Maintenance table
Daily before commencing
work
Drain the air pressure reservoir (Air
brake system)
Seite 131
When refilling the seed box
of hourly
Check the seed placement depth
Seite 90
Check the metering devices for
cleanliness
Check seed hoses for cleanliness
During operation
Check distributor heads for cleanli-
ness
Seite 119
Daily after having finished
work
Empty metering devices and clean
Seite 112
Clean the machine (if necessary)
Seite 118
Every week, after every 50
hours of operation at the
latest
Workshop work Check the hydraulic hose lines
Seite 124
Every 2 weeks, after every
100 operational hours at the
latest
Check tyre pressure
Seite 133
Check oil level in the Vario gearbox
Seite 136
Every 3 months, after every
500 operational hours at the
latest
Inspection of the dual circuit air
brake system
on page 131
Feststellbremse:Bremswirkung im
angezogenen Zustand kontrollieren
Seite 123
Every 6 months before start
of the season
Workshop work Checking and servicing the hydrau-
lic hose lines.
The inspection should be recorded
by the operator.
Seite 124
Workshop work Checking the brake lining thickness
Seite 129
12.3.1
Remedy of function faults and repair work
Changing the tramline bout
width
Workshop work
Seite 133
10 operational hours after
wheel change
Workshop work Retighten wheel and hub bolts
Seite 131