Adjustments
78
Citan BAG0014.4 09.14
8.1.2
Exchanging metering wheels
Hint!
The exchange of metering wheels is
easier when the seed hopper is
empty.
Fig. 56
Exchange the metering wheel in the metering
unit:
1. Remove the lynch pin (Fig. 56/2)
(only required for closing the filled seed
hopper with the aid of the slide (Fig. 56/1).
2. Push the shutter (Fig. 57/1) until its stop
into the metering unit.
Fig. 57
3. Just slacken the two thumb nuts (Fig. 58/1),
do not remove them.
4. Twist the bearings and pull them off.
Fig. 58
5. Pull the metering wheel off the metering
unit.
6. Take the necessary metering wheel from
table (Table 2 / Table 3) and assemble in
vice versa order.
7. Equip all other metering units with equal
metering wheels.
Fig. 59
Important!
Open all shutters (Fig. 56/1) and
secure using lynch pins (Fig. 56/2).