Figure 26 Network Cable Type B
Figure 23
CB front and back view
, Wiring Connectors
Figure 24 WiFi Module installation
Step13-5
Connect the Backup and Grid cables in advance according to the connector
mode, and connect them to the Backup and Grid board connectors in turn.
Step14
Remove the WiFi panel on the top and install the WiFi module (tool: T20
screwdriver, torque: 1.6Nm). Please refer to section 5 configuration network instructions.
Step15
Take out the communication cable set provided in the accessory parts of one
SMILE5-BAT, cut off one end and crimp a new RJ45 connector. If there are two
batteries, you only need to remake one of battery communication cable on site.
INSTALLATION
INSTALLATION
NOTE
: Recommended AC circuit breaker rating is 32A.
NOTE
: Installer in Australia or New Zealand
could
install external
circuit breaker or switch for backup and grid side.
NOTE
: In Australia and New Zealand, the neutral of backup and grid circuit
should be externally connected on the neutral bar.
NOTE
: No external earthing required. After the PE line of AC cables has been
grounded, the whole inverter including the case will be grounded.
NOTE
: The type AC
30mA
RCD
could
be installed on the backup port of
the system. In addition, the installation of inverter must fulfill AS/NZS 3000,
AS/NZS 4777.1 and AS/NZS 5033
standards
.
WiFi Panel
19
20
Bat Cable
Bat Cable
PV connection port
Connect with MC4 connector
DRMs for DRED connection
BAT for Communication
Figure 25 Communication interface of the inverter
PS: This series inverter use RJ45 socket as DRM connection, the pin
assignment table has been shown on the left