Chapter 12: Installing a Media Converter Module
108
Section II: Installation
2. Unpack the media converter module from its shipping container and
verify the package contents, listed in Table 26. If any item is missing or
damaged, contact your Allied Telesis sales representative for
assistance.
Note
You should retain the packaging material in the event you need to
return the unit to Allied Telesis.
3. Remove the insulator labelled “REMOVE BEFORE INSTALL” from the
battery on the media converter module by sliding it out from beneath
the battery clip.
Figure 51. Removing the Battery Insulator
Table 26. AT-MCF2000 Media Converter Module Items
Component
Description
One AT-MCF2012LC,
AT-MCF2012LC/1 or
AT-MCF2032SP Module
One Installation and User
Documentation CD or one
Media Converter Module
Installation Guide
1390
1405
Fast Ethernet
Media Converter
AT-MCF2012LC
Installation
Guide
Modules
AT-MCF2012LC/1
or
1169b
Battery Insulator
Summary of Contents for AT-MCF2000
Page 8: ...Contents 8...
Page 12: ...Tables 12...
Page 18: ...Preface 18...
Page 20: ...20 Section I Features...
Page 26: ...Chapter 1 AT MCF2000 Multi channel Media Converter Series 26 Section I Features...
Page 54: ...Chapter 3 AT MCF2012LC AT MCF2012LC 1 and AT MCF2032SP Modules 54 Section I Features...
Page 72: ...Chapter 4 AT MCF2000M Management Module 72 Section I Features...
Page 84: ...Chapter 5 AT MCF2000S Stacking Module 84 Section I Features...
Page 86: ...86 Section II Installation...
Page 90: ...Chapter 6 Reviewing the Safety Precautions 90 Section II Installation...
Page 92: ...Chapter 7 Selecting a Location 92 Section II Installation...
Page 96: ...Chapter 8 Unpacking the AT MCF2000 or AT MCF2300 Chassis 96 Section II Installation...
Page 98: ...Chapter 9 Removing the Rubber Feet 98 Section II Installation...
Page 106: ...Chapter 11 Installing the AT MCF2KFAN Module 106 Section II Installation...
Page 110: ...Chapter 12 Installing a Media Converter Module 110 Section II Installation...
Page 122: ...Chapter 15 Installing the Chassis in an Equipment Rack 122 Section II Installation...
Page 128: ...Chapter 17 Installing the SFP Modules in the AT MCF2032SP Module 128 Section II Installation...
Page 130: ...Chapter 18 Cabling the Ports on the Media Converter Module 130 Section II Installation...
Page 134: ...Chapter 19 Cabling the AT MCF2000M and AT MCF2000S Modules 134 Section II Installation...
Page 138: ...Chapter 20 Powering on the Chassis 138 Section II Installation...
Page 156: ...Chapter 23 Troubleshooting the Modules 156 Section II Installation...
Page 186: ...Appendix C Cleaning Fiber Optic Connectors 186...
Page 190: ...Index 190...