background image

506725-01

Page 40 of 48

Issue 1109

BLOWER DATA A93DF1D / 92G1DF

 A93DF1D / 92G1DF 070*12B PERFORMANCE (Less Filter)

External

Static

Pressure

in. w.g.

Air Volume / Watts at Various Blower Speeds

High

Medium-

High

Medium-

Low

Low

cfm Watts cfm Watts cfm Watts cfm Watts

0.00

1505

660

1310

570

1090

455

940

390

0.10

1480

625

1295

550

1070

435

935

365

0.20

1405

585

1255

515

1055

425

930

350

0.30

1355

580

1225

475

1045

405

900

330

0.40

1305

540

1165

470

1010

385

890

325

0.50

1270

525

1110

425

975

370

835

305

0.60

1175

500

1080

415

925

345

815

290

0.70

1105

460

1000

395

855

320

745

270

0.80

1040

440

925

365

790

300

670

250

0.90

920

400

825

335

680

270

560

225

 A93DF1D / 92G1DF 110*20C PERFORMANCE (Less Filter)

External

Static

Pressure

in. w.g.

Air Volume / Watts at Various Blower Speeds

High

Medium-

High

Medium-

Low

Low

cfm Watts cfm Watts cfm Watts cfm Watts

0.00

2410 1390 2190 1080 1860

910

1560

735

0.10

2405 1385 2180 1070 1855

905

1555

730

0.20

2285 1345 2120 1030 1850

865

1540

720

0.30

2220 1315 2015 1005 1770

840

1535

705

0.40

2185 1295 1950

955

1750

815

1530

685

0.50

2045 1240 1830

925

1680

790

1500

660

0.60

1965 1220 1710

890

1575

755

1445

640

0.70

1820 1165 1610

850

1495

720

1370

615

0.80

1625 1155 1510

820

1400

695

1315

595

0.90

1455 1110 1390

790

1350

660

1210

565

A93DF1D / 92G1DF 045*12B PERFORMANCE (Less Filter)

External

Static

Pressure

in. w.g.

Air Volume / Watts at Various Blower Speeds

High

Medium-

High

Medium-

Low

Low

cfm Watts cfm Watts cfm Watts cfm Watts

0.00

1615

650

1385

555

1205

465

1045

390

0.10

1605

640

1375

545

1195

455

1035

380

0.20

1500

620

1340

525

1165

445

1015

370

0.30

1450

590

1290

490

1125

420

975

365

0.40

1350

560

1235

480

1090

405

920

345

0.50

1300

545

1170

450

1035

380

875

335

0.60

1195

500

1095

425

990

365

840

320

0.70

1140

485

1020

400

895

345

780

300

0.80

1025

450

920

370

840

330

695

275

0.90

945

435

800

335

700

295

605

250

 A93DF1D / 92G1DF 090*16C PERFORMANCE (Less Filter)

External

Static

Pressure

in. w.g.

Air Volume / Watts at Various Blower Speeds

High

Medium-

High

Medium-

Low

Low

cfm Watts cfm Watts cfm Watts cfm Watts

0.00

2145

900

1865

740

1545

635

1295

530

0.10

2135

890

1855

730

1540

625

1290

520

0.20

2065

845

1815

710

1525

600

1285

500

0.30

2010

825

1760

685

1510

580

1275

485

0.40

1930

775

1705

630

1495

575

1235

455

0.50

1845

740

1645

610

1450

530

1215

450

0.60

1745

700

1525

550

1380

505

1185

430

0.70

1620

650

1460

535

1315

480

1110

405

0.80

1450

585

1340

505

1220

445

1020

375

0.90

1320

555

1130

450

1010

385

920

345

NOTES: 

All air data is measured external to unit without filter (not furnished - field provided)

Summary of Contents for 92G1DF

Page 1: ...lent service agency or the gas supplier WARNING Unit Dimensions 2 A95 A93 95G1 92G1DF Parts Arrangement 3 A95 A93 95G1 92G1DF Gas Furnace 4 Shipping and Packing List 4 Safety Information 4 Use of Furn...

Page 2: ...4 489 9 1 8 232 Right 6 9 16 167 Left 2 51 Either Side 3 4 19 B Supply Air 9 16 14 9 16 14 9 16 14 19 7 16 494 CONDENSATE TRAP CONNECTION 5 127 6 1 2 165 Either Side 2 1 4 57 Either Side 1 25 Front Pa...

Page 3: ...trol transformer and door switch BAG ASSEMBLY BLOWER MOTOR hidden BLOWER ACCESS PANEL HEATING ACCESS PANEL COMBUSTION AIR INDUCER BURNER BOX ASSEMBLY includes flame sensor rollout switches and ignitor...

Page 4: ...DANGER OF EXPLOSION DANGER There are circumstances in which odorant used with LP Propane gas can lose its scent In case of a leak LP Propanegaswillsettleclosetothefloorandmaybedifficult to smell An L...

Page 5: ...n addition in the United States installation must conform with the current National Electric Code ANSI NFPANo 70 The National Electric Code ANSI NFPA No 70 is available from the following address Nati...

Page 6: ...or fitter only The gas cock must be T handle type When a furnace is installed in an attic the passageway to and service area surrounding the equipment shall be floored Combustion Dilution Ventilation...

Page 7: ...door Though an area may appear to be unconfined it might be necessary to bring in outdoor air for combustion if the structure does not provide enough air by Do not install the furnace in a corrosive o...

Page 8: ...protective covering is not known for calculating the size opening required it may be assumed that wood louvers will have 20 to 25 percent free area and metal louvers and grilles will have 60 to 75 pe...

Page 9: ...affect the operation of the safety control devices which could result in personal injury or death Select a location that allows for the required clearances that are listed on the unit nameplate Also...

Page 10: ...ble Flooring Figure 13 1 When unit is installed on a combustible floor a downflow combustible flooring base must be installed between the furnace and the floor The base must be ordered separately See...

Page 11: ...net and check for air leaks Return Air Opening Downflow Units Return air may be brought in only through the top opening of a furnace installed in the downflow position The following steps should be ta...

Page 12: ...essure the flue products can be pulled back down the vent pipe and into the room This reverse flow of the flue gas may result in incomplete combustion and the formation of carbon monoxide gas This tox...

Page 13: ...n approved vent exhaust system When bonding the vent system to the furnace use ULC S636 approved One Step Transition Cement to bond the pipe to the flue collar In addition the first three feet of vent...

Page 14: ...ment Hammer blows should not be used when inserting pipe 8 After assembly wipe excess cement from pipe at end of fitting socket A properly made join will show a bead around its entire perimeter Any ga...

Page 15: ...ence where unit is shut down for an extended period of time such as a vacation home make provisions for draining condensate collection trap and lines Exhaust Piping Figure 20 Route piping to outside o...

Page 16: ...117 117 98 98 4 46 31 n a 85 65 28 112 112 93 93 5 41 26 80 60 23 107 107 88 88 6 36 21 75 55 18 102 102 83 83 7 31 16 70 50 13 97 97 78 78 8 26 11 65 45 n a 92 92 73 73 9 21 n a 60 40 87 87 68 68 10...

Page 17: ...ength of 2 PVC pipe possible NOTE Intake pipe and exhaust pipe must be the same diameter 2 2 2 FIGURE 20 TYPICAL EXHAUST PIPE CONNECTIONS TRANSITION 2 2 2 3 Pipe size determined in Table 7 2 2 or DO N...

Page 18: ...ANSI Z223 1 NFPA54 in U S A and current CSA B149 Natural Gas and Propane Installation Codes in Canada for details Position termination according to location given in Figure 23 or 24 In addition positi...

Page 19: ...hanical air supply inlet to building or the com bustion air inlet to any other ap pliance Clearance to mechanical air sup ply inlet Clearance above paved sidewalk or paved driveway located on public p...

Page 20: ...building or the com bustion air inlet to any other ap pliance Clearance to mechanical air sup ply inlet Clearance above paved sidewalk or paved driveway located on public property Clearance under ver...

Page 21: ...ns a minimum distance between the end of the exhaust pipe and the end of the intake pipe without a termination elbow is 8 and a minimum distance of 6 with a termination elbow See Figures 28 and 29 7 I...

Page 22: ...lerator in applications that include an exhaust termination tee The accelerator is not required 2 As required Flue gas may be acidic and may adversely affect some building materials If a side wall ven...

Page 23: ...A D WALL SUPPORT 1 2 13mm ARMAFLEX INSULATION IN UNCONDITIONED SPACE IF REQUIRED E EXTENDED APPLICATION A IF REQUIRED FIGURE 29 FIELD SUPPLIED WALL TERMINATION See venting Table 7 for maximum venting...

Page 24: ...AIR 5 1 2 140mm Front View 12 305mm 5 127mm 18 MAX 457mm EXHAUST VENT INTAKE AIR OPTIONAL VENT TERMINATION FOR MULTIPLE UNIT INSTALLATION OF DIRECT VENT WALL TERMINATION KIT Inches mm Side View 12 305...

Page 25: ...3mm ARMAFLEX INSULATION NON DIRECT VENT FIELD SUPPLIED WALL TERMINATION SIZE TERMINATION PIPE PER TABLE 8 FIELD PROVIDED REDUCER MAY BE REQUIRED TO ADAPT LARGER VENT PIPE SIZE TO TERMINATION 12 MIN 30...

Page 26: ...furnace to the drain 5 If unit will be started immediately upon completion of installation prime trap per procedure outlined in Unit Start Up section FIGURE 39 CONDENSATE TRAP LOCATION shown with righ...

Page 27: ...in To Drain 90 Elbow 3 4 inch PVC Not Furnished To Drain 90 Elbow 1 2 inch PVC Not Furnished 1 2 inch PVC Pipe Not Furnished Drain Assembly for 3 4 inch Drain Pipe OPTIONAL Drain Piping OPTIONAL Conde...

Page 28: ...10 feet 2 44 to 3 05 m using suitable hangers or straps Install a drip leg in vertical pipe runs to serve as a trap for sediment or condensate 5 A1 8 N P T plugged tap or pressure post is located on t...

Page 29: ...4 28 138 3 91 125 3 54 118 3 34 110 3 11 103 2 92 1 25 4 1 049 26 645 680 19 25 465 13 17 375 10 62 320 9 06 285 8 07 260 7 36 240 6 80 220 6 23 205 5 80 195 5 52 1 1 4 31 75 1 380 35 052 1400 39 64...

Page 30: ...orrosion or other deficiencies which could cause an unsafe condition 3 Close all building doors and windows and all doors between the space in which the appliances remaining connected to the common ve...

Page 31: ...switch near the furnace so that power can be turned off for servicing Before connecting the thermostat check to make sure the wires will be long enough for servicing at a later date Make sure that th...

Page 32: ...specifying a generator for use with this equipment The furnace requires 120 volts 10 Range 108 volts to 132 volts The furnace operates at 60 Hz 5 Range 57 Hz to 63 Hz The furnace integrated control re...

Page 33: ...506725 01 Page 33 of 48 Issue 1109 TYPICAL WIRING DIAGRAM FIGURE 48...

Page 34: ...and do not try to repair it Force or attempted repair may result in a fire or explosion Placing the furnace into operation This furnace is equipped with an automatic hot surface ignition system Do not...

Page 35: ...tially started steps 1 through 11 may need to be repeated to purge air from gas line 12 If the appliance will not operate follow the instructions Turning Off Gas to Unit and call your service technici...

Page 36: ...e reading has been obtained Take care to remove barbed fitting and replace threaded plug Proper Combustion Furnace should operate minimum 15 minutes with correct manifold pressure and gas flow rate be...

Page 37: ...factory set No adjustment necessary All models use the factory installed pressure switch from 0 7 500 feet Unit Size 0 4 500 ft 0 1 373 m 4 501 7 500 ft 1 373 2 286 m 7 501 10 000 ft 2 286 3 038 m 045...

Page 38: ...2 Visually inspect the venting system for proper size and horizontal pitch Determine there is no blockage or restriction leakage corrosion or other deficiencies which could cause an unsafe condition 3...

Page 39: ...e unit Electrical 1 Check all wiring for loose connections 2 Check for the correct voltage at the furnace with furnace operating Correct voltage is 120 VAC 10 3 Check amp draw on the blower motor with...

Page 40: ...70 615 0 80 1625 1155 1510 820 1400 695 1315 595 0 90 1455 1110 1390 790 1350 660 1210 565 A93DF1D 92G1DF 045 12B PERFORMANCE Less Filter External Static Pressure in w g Air Volume Watts at Various Bl...

Page 41: ...80 1735 1030 1620 740 1590 620 1415 535 0 90 1640 1010 1535 715 1480 600 1330 510 A95DF1D 95G1DF 045 12B PERFORMANCE Less Filter External Static Pressure in w g Air Volume Watts at Various Blower Spe...

Page 42: ...rap then reinstall the clean out cap Cleaning Heat Exchanger If cleaning the heat exchanger becomes necessary follow the below procedures and refer to Figure 1 when disassembling unit Use papers or pr...

Page 43: ...d electrical connections when re establishing supplies 38 Follow lighting instructions to light and operate furnace for 5 minutes to ensure that heat exchanger is clean and dry and that furnace is ope...

Page 44: ...al between the return air and the room where the furnace is installed Return air duct Must be properly attached and provide an air seal to the unit Operating performance Unit must be observed during o...

Page 45: ...valent service agency or gas supplier Cabinet Parts Heating Compartment Access Panel Blower Compartment Access Panel Top Cap Control Panel Parts Transformer Integrated Control Board Door Interlock Swi...

Page 46: ...lled Properly Pipes Supported Condensate Trap Primed Line Sloped Heat Cable Installed and Operable if applicable 2 2 2 1 Horizontal Pipes Sloped if applicable UNIT SET UP 3 4 Flter RETURN AIR Furnace...

Page 47: ...y External Static Return External Static Total External Static CONDENSATE LINE 6 Leak Free VENT PIPE 7 Leak Free COOLING MODE INDOOR BLOWER AMPS______ 3 TEMPERATURE DROP Return Duct Temperature Supply...

Page 48: ...mum height of eight 8 feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment The sign shall read in print size no less t...

Reviews: