Filters

This unit is not equipped with a filter or rack.  A field provided

filter is required for the unit to operate properly.  Table 3 lists

recommended filter sizes.

A filter must be in place whenever the unit is operating.

  CAUTION

Solvent cements for plastic pipe are flammable liquids

and should be kept away from all sources of ignition.

Do not use excessive amounts of solvent cement when

making joints.  Good ventilation should be maintained

to reduce fire hazard and to minimize breathing of

solvent vapors.  Avoid contact of cement with skin and

eyes.

Duct System

Use industry-approved standards to size and install the

supply and return air duct system.  This will result in a quiet

and low-static system that has uniform air distribution.

NOTE:

  

This furnace is not certified for operation in heating

mode (indoor blower operating at selected heating speed)

with an external static pressure which exceeds 0.5 inches

w.c.  Operation at these conditions may result in improper

limit operation.

Supply Air Plenum

If the fumace is installed without a cooling coil, a removable

access panel should be installed in the supply air duct.  The

access panel should be large enough to permit inspection

(by reflected light) of the heat exchanger for leaks after the

furnace is installed.  The furnace access panel must always

be in place when the furnace is operating and it must not

allow leaks into the supply air duct system.

Return Air Plenum

NOTE:

  

Return air must not be drawn from a room where

this furnace, or any other gas-fueled appliance (i.e.,

water heater), or carbon monoxide-producing device

(i.e., wood fireplace) is installed.

When return air is drawn from a room, a negative pressure

is created in the room.  If a gas appliance is operating in a

room with negative pressure, the flue products can be pulled

back down the vent pipe and into the room.  This reverse

flow of the flue gas may result in incomplete combustion

and the formation of carbon monoxide gas.  This toxic gas

might then be distributed throughout the house by the furnace

duct system.

Use fiberglass sealing strips, caulking, or equivalent sealing

method between the plenum and the furnace cabinet to

ensure a tight seal.  If a filter is installed, size the return air

duct to fit the filter frame.

Pipe & Fittings Specifications

All pipe, fittings, primer and solvent cement must conform

with American National Standard Institute and the American

Society for Testing and Materials (ANSI/ASTM) standards.

The solvent shall be free flowing and contain no lumps,

undissolved particles or any foreign matter that adversely

affects the joint strength or chemical resistance of the

cement. The cement shall show no gelation, stratification,

or separation that cannot be removed by stirring.  Refer to

Table 4 below for approved piping and fitting materials.

TABLE 4

PIPING AND FITTINGS SPECIFICATIONS

Schedule 40 PVC (Pipe)

D1785

Schedule 40 PVC (Cellular Core Pipe)

F891

Schedule 40 PVC (Fittings)

D2466

Schedule 40 CPVC (Pipe)

F441

Schedule 40 CPVC (Fittings)

F438

SDR−21 PVC or SDR−26 PVC (Pipe)

D2241

SDR−21 CPVC or SDR−26 CPVC (Pipe)

F442

Schedule 40 ABS Cellular Core DWV (Pipe)

F628

Schedule 40 ABS (Pipe)

D1527

Schedule 40 ABS (Fittings)

D2468

ABS−DWV (Drain Waste & Vent)
(Pipe & Fittings)

D2661

PVC−DWV (Drain Waste & Vent) 
Pipe & Fittings)

D2665

PRIMER & SOLVENT CEMENT

ASTM

SPECIFICATION

PVC & CPVC Primer

F656

PVC Solvent Cement

D2564

CPVC Solvent Cement

F493

ABS Solvent Cement

D2235

PVC/CPVC/ABS All Purpose Cement For
Fittings & Pipe of the same material

D2564, D2235, F493

ABS to PVC or CPVC Transition Solvent
Cement

D3138

CANADA PIPE & FITTING & SOLVENT

CEMENT

MARKING

PVC & CPVC Pipe and Fittings

ULCS636

PVC & CPVC Solvent Cement

ABS to PVC or CPVC Transition Cement

TABLE 3

Furnace

Cabinet Width

Filter Size

16 x 25 x 1 (1)

17−1/2"

21"

Summary of Contents for 92G1DF

Page 1: ...lent service agency or the gas supplier WARNING Unit Dimensions 2 A95 A93 95G1 92G1DF Parts Arrangement 3 A95 A93 95G1 92G1DF Gas Furnace 4 Shipping and Packing List 4 Safety Information 4 Use of Furn...

Page 2: ...4 489 9 1 8 232 Right 6 9 16 167 Left 2 51 Either Side 3 4 19 B Supply Air 9 16 14 9 16 14 9 16 14 19 7 16 494 CONDENSATE TRAP CONNECTION 5 127 6 1 2 165 Either Side 2 1 4 57 Either Side 1 25 Front Pa...

Page 3: ...trol transformer and door switch BAG ASSEMBLY BLOWER MOTOR hidden BLOWER ACCESS PANEL HEATING ACCESS PANEL COMBUSTION AIR INDUCER BURNER BOX ASSEMBLY includes flame sensor rollout switches and ignitor...

Page 4: ...DANGER OF EXPLOSION DANGER There are circumstances in which odorant used with LP Propane gas can lose its scent In case of a leak LP Propanegaswillsettleclosetothefloorandmaybedifficult to smell An L...

Page 5: ...n addition in the United States installation must conform with the current National Electric Code ANSI NFPANo 70 The National Electric Code ANSI NFPA No 70 is available from the following address Nati...

Page 6: ...or fitter only The gas cock must be T handle type When a furnace is installed in an attic the passageway to and service area surrounding the equipment shall be floored Combustion Dilution Ventilation...

Page 7: ...door Though an area may appear to be unconfined it might be necessary to bring in outdoor air for combustion if the structure does not provide enough air by Do not install the furnace in a corrosive o...

Page 8: ...protective covering is not known for calculating the size opening required it may be assumed that wood louvers will have 20 to 25 percent free area and metal louvers and grilles will have 60 to 75 pe...

Page 9: ...affect the operation of the safety control devices which could result in personal injury or death Select a location that allows for the required clearances that are listed on the unit nameplate Also...

Page 10: ...ble Flooring Figure 13 1 When unit is installed on a combustible floor a downflow combustible flooring base must be installed between the furnace and the floor The base must be ordered separately See...

Page 11: ...net and check for air leaks Return Air Opening Downflow Units Return air may be brought in only through the top opening of a furnace installed in the downflow position The following steps should be ta...

Page 12: ...essure the flue products can be pulled back down the vent pipe and into the room This reverse flow of the flue gas may result in incomplete combustion and the formation of carbon monoxide gas This tox...

Page 13: ...n approved vent exhaust system When bonding the vent system to the furnace use ULC S636 approved One Step Transition Cement to bond the pipe to the flue collar In addition the first three feet of vent...

Page 14: ...ment Hammer blows should not be used when inserting pipe 8 After assembly wipe excess cement from pipe at end of fitting socket A properly made join will show a bead around its entire perimeter Any ga...

Page 15: ...ence where unit is shut down for an extended period of time such as a vacation home make provisions for draining condensate collection trap and lines Exhaust Piping Figure 20 Route piping to outside o...

Page 16: ...117 117 98 98 4 46 31 n a 85 65 28 112 112 93 93 5 41 26 80 60 23 107 107 88 88 6 36 21 75 55 18 102 102 83 83 7 31 16 70 50 13 97 97 78 78 8 26 11 65 45 n a 92 92 73 73 9 21 n a 60 40 87 87 68 68 10...

Page 17: ...ength of 2 PVC pipe possible NOTE Intake pipe and exhaust pipe must be the same diameter 2 2 2 FIGURE 20 TYPICAL EXHAUST PIPE CONNECTIONS TRANSITION 2 2 2 3 Pipe size determined in Table 7 2 2 or DO N...

Page 18: ...ANSI Z223 1 NFPA54 in U S A and current CSA B149 Natural Gas and Propane Installation Codes in Canada for details Position termination according to location given in Figure 23 or 24 In addition positi...

Page 19: ...hanical air supply inlet to building or the com bustion air inlet to any other ap pliance Clearance to mechanical air sup ply inlet Clearance above paved sidewalk or paved driveway located on public p...

Page 20: ...building or the com bustion air inlet to any other ap pliance Clearance to mechanical air sup ply inlet Clearance above paved sidewalk or paved driveway located on public property Clearance under ver...

Page 21: ...ns a minimum distance between the end of the exhaust pipe and the end of the intake pipe without a termination elbow is 8 and a minimum distance of 6 with a termination elbow See Figures 28 and 29 7 I...

Page 22: ...lerator in applications that include an exhaust termination tee The accelerator is not required 2 As required Flue gas may be acidic and may adversely affect some building materials If a side wall ven...

Page 23: ...A D WALL SUPPORT 1 2 13mm ARMAFLEX INSULATION IN UNCONDITIONED SPACE IF REQUIRED E EXTENDED APPLICATION A IF REQUIRED FIGURE 29 FIELD SUPPLIED WALL TERMINATION See venting Table 7 for maximum venting...

Page 24: ...AIR 5 1 2 140mm Front View 12 305mm 5 127mm 18 MAX 457mm EXHAUST VENT INTAKE AIR OPTIONAL VENT TERMINATION FOR MULTIPLE UNIT INSTALLATION OF DIRECT VENT WALL TERMINATION KIT Inches mm Side View 12 305...

Page 25: ...3mm ARMAFLEX INSULATION NON DIRECT VENT FIELD SUPPLIED WALL TERMINATION SIZE TERMINATION PIPE PER TABLE 8 FIELD PROVIDED REDUCER MAY BE REQUIRED TO ADAPT LARGER VENT PIPE SIZE TO TERMINATION 12 MIN 30...

Page 26: ...furnace to the drain 5 If unit will be started immediately upon completion of installation prime trap per procedure outlined in Unit Start Up section FIGURE 39 CONDENSATE TRAP LOCATION shown with righ...

Page 27: ...in To Drain 90 Elbow 3 4 inch PVC Not Furnished To Drain 90 Elbow 1 2 inch PVC Not Furnished 1 2 inch PVC Pipe Not Furnished Drain Assembly for 3 4 inch Drain Pipe OPTIONAL Drain Piping OPTIONAL Conde...

Page 28: ...10 feet 2 44 to 3 05 m using suitable hangers or straps Install a drip leg in vertical pipe runs to serve as a trap for sediment or condensate 5 A1 8 N P T plugged tap or pressure post is located on t...

Page 29: ...4 28 138 3 91 125 3 54 118 3 34 110 3 11 103 2 92 1 25 4 1 049 26 645 680 19 25 465 13 17 375 10 62 320 9 06 285 8 07 260 7 36 240 6 80 220 6 23 205 5 80 195 5 52 1 1 4 31 75 1 380 35 052 1400 39 64...

Page 30: ...orrosion or other deficiencies which could cause an unsafe condition 3 Close all building doors and windows and all doors between the space in which the appliances remaining connected to the common ve...

Page 31: ...switch near the furnace so that power can be turned off for servicing Before connecting the thermostat check to make sure the wires will be long enough for servicing at a later date Make sure that th...

Page 32: ...specifying a generator for use with this equipment The furnace requires 120 volts 10 Range 108 volts to 132 volts The furnace operates at 60 Hz 5 Range 57 Hz to 63 Hz The furnace integrated control re...

Page 33: ...506725 01 Page 33 of 48 Issue 1109 TYPICAL WIRING DIAGRAM FIGURE 48...

Page 34: ...and do not try to repair it Force or attempted repair may result in a fire or explosion Placing the furnace into operation This furnace is equipped with an automatic hot surface ignition system Do not...

Page 35: ...tially started steps 1 through 11 may need to be repeated to purge air from gas line 12 If the appliance will not operate follow the instructions Turning Off Gas to Unit and call your service technici...

Page 36: ...e reading has been obtained Take care to remove barbed fitting and replace threaded plug Proper Combustion Furnace should operate minimum 15 minutes with correct manifold pressure and gas flow rate be...

Page 37: ...factory set No adjustment necessary All models use the factory installed pressure switch from 0 7 500 feet Unit Size 0 4 500 ft 0 1 373 m 4 501 7 500 ft 1 373 2 286 m 7 501 10 000 ft 2 286 3 038 m 045...

Page 38: ...2 Visually inspect the venting system for proper size and horizontal pitch Determine there is no blockage or restriction leakage corrosion or other deficiencies which could cause an unsafe condition 3...

Page 39: ...e unit Electrical 1 Check all wiring for loose connections 2 Check for the correct voltage at the furnace with furnace operating Correct voltage is 120 VAC 10 3 Check amp draw on the blower motor with...

Page 40: ...70 615 0 80 1625 1155 1510 820 1400 695 1315 595 0 90 1455 1110 1390 790 1350 660 1210 565 A93DF1D 92G1DF 045 12B PERFORMANCE Less Filter External Static Pressure in w g Air Volume Watts at Various Bl...

Page 41: ...80 1735 1030 1620 740 1590 620 1415 535 0 90 1640 1010 1535 715 1480 600 1330 510 A95DF1D 95G1DF 045 12B PERFORMANCE Less Filter External Static Pressure in w g Air Volume Watts at Various Blower Spe...

Page 42: ...rap then reinstall the clean out cap Cleaning Heat Exchanger If cleaning the heat exchanger becomes necessary follow the below procedures and refer to Figure 1 when disassembling unit Use papers or pr...

Page 43: ...d electrical connections when re establishing supplies 38 Follow lighting instructions to light and operate furnace for 5 minutes to ensure that heat exchanger is clean and dry and that furnace is ope...

Page 44: ...al between the return air and the room where the furnace is installed Return air duct Must be properly attached and provide an air seal to the unit Operating performance Unit must be observed during o...

Page 45: ...valent service agency or gas supplier Cabinet Parts Heating Compartment Access Panel Blower Compartment Access Panel Top Cap Control Panel Parts Transformer Integrated Control Board Door Interlock Swi...

Page 46: ...lled Properly Pipes Supported Condensate Trap Primed Line Sloped Heat Cable Installed and Operable if applicable 2 2 2 1 Horizontal Pipes Sloped if applicable UNIT SET UP 3 4 Flter RETURN AIR Furnace...

Page 47: ...y External Static Return External Static Total External Static CONDENSATE LINE 6 Leak Free VENT PIPE 7 Leak Free COOLING MODE INDOOR BLOWER AMPS______ 3 TEMPERATURE DROP Return Duct Temperature Supply...

Page 48: ...mum height of eight 8 feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment The sign shall read in print size no less t...