background image

506725-01

Page 39 of 48

Issue 1109

Other Unit Adjustments

Primary Limit

The primary limit is located on the heating compartment
vestibule panel.  This limit is factory set and requires no
adjustment.

Flame Rollout Switches (Two)

These manually reset switches are located on the front of

the burner box.  These limits are factory set and require no

adjustment.

Pressure Switch

The pressure switch is located in the heating compartment
on the cold end header box.  This switch checks for proper
combustion air inducer operation before allowing ignition
trial.  The switch is factory set and must not be adjusted.

Temperature Rise

After the furnace has been started and supply and return
air temperatures have been allowed to stabilize, check the
temperature rise.  If necessary, adjust the blower speed to
maintain the temperature rise within the range shown on
the unit nameplate.  Increase the blower speed to decrease
the the temperature.  Decrease the blower speed to increase
the temperature rise.  Failure to adjust the temperature rise
may cause erratic limit operation.

Fan Control

The fan ON time of 30 seconds is not adjustable.  The fan

OFF delay (amount of time that the blower operates after

the heat demand has been satisfied) may be adjusted by

changing the jumper position across the five pins on the

integrated control.  The unit is shipped with a factory heat

fan OFF setting of 120 seconds.  The fan OFF delay affects

comfort and is adjustable to satisfy individual applications.

Adjust the fan OFF delay to achieve a supply air temperature

between 90° and 110° F at the moment that the blower is

de-energized.  Longer OFF delay settings provide lower

return air temperatures; shorter settings provide higher

return air temperatures.  See Figure 51.

Thermostat Heat Anticipation

Set the heat anticipator setting (if adjustable) according to
the amp draw listed on the wiring diagram that is attached
to the unit.

Electrical

1. Check all wiring for loose connections.

2. Check for the correct voltage at the furnace (with

furnace operating).  Correct voltage is 120 VAC ± 10%.

3. Check amp–draw on the blower motor with the blower

compartment access panel in place.
Motor Nameplate__________Actual__________

Blower Speeds

Follow the steps below to change the blower speeds.
1. Turn off electrical power to furnace.
2. Remove blower compartment access panel.
3. Disconnect existing speed tap at control board speed

terminal.

NOTE:

  

Termination of any unused motor leads must be

insulated.

4. Place unused blower speed tap on integrated control

“PARK” terminal or insulate.

5. Refer to blower speed selection chart on unit wiring

diagram for desired heating or cooling speed.  See
Blower performance data beginning on the next page.

6. Connect selected speed tap at control board speed

terminal.

7. Re-secure blower access panel.
8. Turn on electrical power to furnace.
9. Recheck temperature rise.

Electronic Ignition

The integrated control has an added feature of an internal

Watchguard control.  The feature serves as an automatic

reset device for integrated control lockout caused by ignition

failure.  This type of lockout is usually due to low gas line

pressure.  After one hour of continuous thermostat demand

for heat, the Watchguard will break and remake thermostat

demand to the furnace and automatically reset the integrated

control to begin the ignition sequence.

Exhaust and Air Intake Pipe

1. Check exhaust and air intake connections for tightness

and to make sure there is no blockage.

2. Is pressure switch closed?  Obstructed exhaust pipe

will cause unit to shut off at pressure switch.  Check

termination for blockages.

3. Obstructed pipe or termination may cause rollout

switches to open.  Reset manual flame rollout switches

on burner box assembly if necessary.

HEAT FAN-OFF TIME IN SECONDS

To adjust fan−off timing, reposition jumper across pins to

achieve desired setting.

NO JUMPER

FIGURE 51 

60

90

120

180

60

90

120

180

60

90

120

180

60

90

120

180

60 Second 

off Time

90 Second 

off Time

120 Second 

off Time

180 Second 

off Time

Summary of Contents for 92G1DF

Page 1: ...lent service agency or the gas supplier WARNING Unit Dimensions 2 A95 A93 95G1 92G1DF Parts Arrangement 3 A95 A93 95G1 92G1DF Gas Furnace 4 Shipping and Packing List 4 Safety Information 4 Use of Furn...

Page 2: ...4 489 9 1 8 232 Right 6 9 16 167 Left 2 51 Either Side 3 4 19 B Supply Air 9 16 14 9 16 14 9 16 14 19 7 16 494 CONDENSATE TRAP CONNECTION 5 127 6 1 2 165 Either Side 2 1 4 57 Either Side 1 25 Front Pa...

Page 3: ...trol transformer and door switch BAG ASSEMBLY BLOWER MOTOR hidden BLOWER ACCESS PANEL HEATING ACCESS PANEL COMBUSTION AIR INDUCER BURNER BOX ASSEMBLY includes flame sensor rollout switches and ignitor...

Page 4: ...DANGER OF EXPLOSION DANGER There are circumstances in which odorant used with LP Propane gas can lose its scent In case of a leak LP Propanegaswillsettleclosetothefloorandmaybedifficult to smell An L...

Page 5: ...n addition in the United States installation must conform with the current National Electric Code ANSI NFPANo 70 The National Electric Code ANSI NFPA No 70 is available from the following address Nati...

Page 6: ...or fitter only The gas cock must be T handle type When a furnace is installed in an attic the passageway to and service area surrounding the equipment shall be floored Combustion Dilution Ventilation...

Page 7: ...door Though an area may appear to be unconfined it might be necessary to bring in outdoor air for combustion if the structure does not provide enough air by Do not install the furnace in a corrosive o...

Page 8: ...protective covering is not known for calculating the size opening required it may be assumed that wood louvers will have 20 to 25 percent free area and metal louvers and grilles will have 60 to 75 pe...

Page 9: ...affect the operation of the safety control devices which could result in personal injury or death Select a location that allows for the required clearances that are listed on the unit nameplate Also...

Page 10: ...ble Flooring Figure 13 1 When unit is installed on a combustible floor a downflow combustible flooring base must be installed between the furnace and the floor The base must be ordered separately See...

Page 11: ...net and check for air leaks Return Air Opening Downflow Units Return air may be brought in only through the top opening of a furnace installed in the downflow position The following steps should be ta...

Page 12: ...essure the flue products can be pulled back down the vent pipe and into the room This reverse flow of the flue gas may result in incomplete combustion and the formation of carbon monoxide gas This tox...

Page 13: ...n approved vent exhaust system When bonding the vent system to the furnace use ULC S636 approved One Step Transition Cement to bond the pipe to the flue collar In addition the first three feet of vent...

Page 14: ...ment Hammer blows should not be used when inserting pipe 8 After assembly wipe excess cement from pipe at end of fitting socket A properly made join will show a bead around its entire perimeter Any ga...

Page 15: ...ence where unit is shut down for an extended period of time such as a vacation home make provisions for draining condensate collection trap and lines Exhaust Piping Figure 20 Route piping to outside o...

Page 16: ...117 117 98 98 4 46 31 n a 85 65 28 112 112 93 93 5 41 26 80 60 23 107 107 88 88 6 36 21 75 55 18 102 102 83 83 7 31 16 70 50 13 97 97 78 78 8 26 11 65 45 n a 92 92 73 73 9 21 n a 60 40 87 87 68 68 10...

Page 17: ...ength of 2 PVC pipe possible NOTE Intake pipe and exhaust pipe must be the same diameter 2 2 2 FIGURE 20 TYPICAL EXHAUST PIPE CONNECTIONS TRANSITION 2 2 2 3 Pipe size determined in Table 7 2 2 or DO N...

Page 18: ...ANSI Z223 1 NFPA54 in U S A and current CSA B149 Natural Gas and Propane Installation Codes in Canada for details Position termination according to location given in Figure 23 or 24 In addition positi...

Page 19: ...hanical air supply inlet to building or the com bustion air inlet to any other ap pliance Clearance to mechanical air sup ply inlet Clearance above paved sidewalk or paved driveway located on public p...

Page 20: ...building or the com bustion air inlet to any other ap pliance Clearance to mechanical air sup ply inlet Clearance above paved sidewalk or paved driveway located on public property Clearance under ver...

Page 21: ...ns a minimum distance between the end of the exhaust pipe and the end of the intake pipe without a termination elbow is 8 and a minimum distance of 6 with a termination elbow See Figures 28 and 29 7 I...

Page 22: ...lerator in applications that include an exhaust termination tee The accelerator is not required 2 As required Flue gas may be acidic and may adversely affect some building materials If a side wall ven...

Page 23: ...A D WALL SUPPORT 1 2 13mm ARMAFLEX INSULATION IN UNCONDITIONED SPACE IF REQUIRED E EXTENDED APPLICATION A IF REQUIRED FIGURE 29 FIELD SUPPLIED WALL TERMINATION See venting Table 7 for maximum venting...

Page 24: ...AIR 5 1 2 140mm Front View 12 305mm 5 127mm 18 MAX 457mm EXHAUST VENT INTAKE AIR OPTIONAL VENT TERMINATION FOR MULTIPLE UNIT INSTALLATION OF DIRECT VENT WALL TERMINATION KIT Inches mm Side View 12 305...

Page 25: ...3mm ARMAFLEX INSULATION NON DIRECT VENT FIELD SUPPLIED WALL TERMINATION SIZE TERMINATION PIPE PER TABLE 8 FIELD PROVIDED REDUCER MAY BE REQUIRED TO ADAPT LARGER VENT PIPE SIZE TO TERMINATION 12 MIN 30...

Page 26: ...furnace to the drain 5 If unit will be started immediately upon completion of installation prime trap per procedure outlined in Unit Start Up section FIGURE 39 CONDENSATE TRAP LOCATION shown with righ...

Page 27: ...in To Drain 90 Elbow 3 4 inch PVC Not Furnished To Drain 90 Elbow 1 2 inch PVC Not Furnished 1 2 inch PVC Pipe Not Furnished Drain Assembly for 3 4 inch Drain Pipe OPTIONAL Drain Piping OPTIONAL Conde...

Page 28: ...10 feet 2 44 to 3 05 m using suitable hangers or straps Install a drip leg in vertical pipe runs to serve as a trap for sediment or condensate 5 A1 8 N P T plugged tap or pressure post is located on t...

Page 29: ...4 28 138 3 91 125 3 54 118 3 34 110 3 11 103 2 92 1 25 4 1 049 26 645 680 19 25 465 13 17 375 10 62 320 9 06 285 8 07 260 7 36 240 6 80 220 6 23 205 5 80 195 5 52 1 1 4 31 75 1 380 35 052 1400 39 64...

Page 30: ...orrosion or other deficiencies which could cause an unsafe condition 3 Close all building doors and windows and all doors between the space in which the appliances remaining connected to the common ve...

Page 31: ...switch near the furnace so that power can be turned off for servicing Before connecting the thermostat check to make sure the wires will be long enough for servicing at a later date Make sure that th...

Page 32: ...specifying a generator for use with this equipment The furnace requires 120 volts 10 Range 108 volts to 132 volts The furnace operates at 60 Hz 5 Range 57 Hz to 63 Hz The furnace integrated control re...

Page 33: ...506725 01 Page 33 of 48 Issue 1109 TYPICAL WIRING DIAGRAM FIGURE 48...

Page 34: ...and do not try to repair it Force or attempted repair may result in a fire or explosion Placing the furnace into operation This furnace is equipped with an automatic hot surface ignition system Do not...

Page 35: ...tially started steps 1 through 11 may need to be repeated to purge air from gas line 12 If the appliance will not operate follow the instructions Turning Off Gas to Unit and call your service technici...

Page 36: ...e reading has been obtained Take care to remove barbed fitting and replace threaded plug Proper Combustion Furnace should operate minimum 15 minutes with correct manifold pressure and gas flow rate be...

Page 37: ...factory set No adjustment necessary All models use the factory installed pressure switch from 0 7 500 feet Unit Size 0 4 500 ft 0 1 373 m 4 501 7 500 ft 1 373 2 286 m 7 501 10 000 ft 2 286 3 038 m 045...

Page 38: ...2 Visually inspect the venting system for proper size and horizontal pitch Determine there is no blockage or restriction leakage corrosion or other deficiencies which could cause an unsafe condition 3...

Page 39: ...e unit Electrical 1 Check all wiring for loose connections 2 Check for the correct voltage at the furnace with furnace operating Correct voltage is 120 VAC 10 3 Check amp draw on the blower motor with...

Page 40: ...70 615 0 80 1625 1155 1510 820 1400 695 1315 595 0 90 1455 1110 1390 790 1350 660 1210 565 A93DF1D 92G1DF 045 12B PERFORMANCE Less Filter External Static Pressure in w g Air Volume Watts at Various Bl...

Page 41: ...80 1735 1030 1620 740 1590 620 1415 535 0 90 1640 1010 1535 715 1480 600 1330 510 A95DF1D 95G1DF 045 12B PERFORMANCE Less Filter External Static Pressure in w g Air Volume Watts at Various Blower Spe...

Page 42: ...rap then reinstall the clean out cap Cleaning Heat Exchanger If cleaning the heat exchanger becomes necessary follow the below procedures and refer to Figure 1 when disassembling unit Use papers or pr...

Page 43: ...d electrical connections when re establishing supplies 38 Follow lighting instructions to light and operate furnace for 5 minutes to ensure that heat exchanger is clean and dry and that furnace is ope...

Page 44: ...al between the return air and the room where the furnace is installed Return air duct Must be properly attached and provide an air seal to the unit Operating performance Unit must be observed during o...

Page 45: ...valent service agency or gas supplier Cabinet Parts Heating Compartment Access Panel Blower Compartment Access Panel Top Cap Control Panel Parts Transformer Integrated Control Board Door Interlock Swi...

Page 46: ...lled Properly Pipes Supported Condensate Trap Primed Line Sloped Heat Cable Installed and Operable if applicable 2 2 2 1 Horizontal Pipes Sloped if applicable UNIT SET UP 3 4 Flter RETURN AIR Furnace...

Page 47: ...y External Static Return External Static Total External Static CONDENSATE LINE 6 Leak Free VENT PIPE 7 Leak Free COOLING MODE INDOOR BLOWER AMPS______ 3 TEMPERATURE DROP Return Duct Temperature Supply...

Page 48: ...mum height of eight 8 feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment The sign shall read in print size no less t...

Reviews: