60549
51
Section 5 Service Procedures
To reduce the risk of electric shock, fire, explosion, serious injury or death:
• Disconnect electric power to the dryer(s) before servicing.
• Close gas shut-off valve to gas dryer(s) before servicing.
• Never start the dryer(s) with any guards/panels removed.
• Whenever ground wires are removed during servicing, these ground wires must be
reconnected to ensure that the dryer is properly grounded.
W001R1
WARNING
© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
NOTE: Do not let terminal block insulation drop
when removing the block. Insulation must be in
place when reinstalling block.
b. Power Cord – Gas Models
(1) Remove access plate on rear of cabinet.
(2) Remove strain relief.
(3) Remove screw holding power cord ground
wire to terminal block bracket.
NOTE: Reconnect ground wire into same hole in
bracket when reinstalling power cord.
(4) Disengage strain relief holding power cord
in dryer cabinet.
(5) Disconnect power cord wires at disconnect
blocks, then remove power cord from rear
of dryer cabinet.
Figure 36
DRY1062S
DRY950S
CABINET TOP
HINGES
TERMINAL BLOCK
INSULATION
TERMINAL BLOCK
BRACKET
TERMINAL BLOCK
ATTACHING SCREW
Through Serial No. S6271975XG
Starting Serial No. S6271976XG
TERMINAL
BLOCK
ATTACHING
SCREWS
BRACKET
SCREWS
GROUND
WIRE