18
Rockwell Automation Publication 2080-UM005E-EN-E - March 2018
Chapter 2
About Your Controller
For this example, the new IP Address is set to the following:
•
IP address = 192.168.1.10
•
Subnet mask = 255.255.255.0
•
Gateway address = 192.168.1.1
RMCC EtherNet/IP Example – Set the Message Length
After the new IP address is configured and applied, the controller will disconnect
from Connected Components Workbench if communication is through
Ethernet.
You can verify that the IP address has changed after performing RMCC by
looking at the Ethernet settings for the controller.
RMCC EtherNet/IP Example – Verify Address Change
Agency Certifications
•
UL Listed Industrial Control Equipment, certified for US and Canada.
UL Listed for Class I, Division 2 Group A,B,C,D Hazardous Locations,
certified for U.S. and Canada.
•
CE marked for all applicable directives
•
C-Tick marked for all applicable acts
•
KC - Korean Registration of Broadcasting and Communications
Equipment, compliant with: Article 58-2 of Radio Waves Act, Clause 3.
IMPORTANT
You should not perform IP address changes continuously. Allow an
interval of at least six seconds before performing the next IP address
change in order for duplicate address detection to work properly.
Summary of Contents for 2080-LC20-20AWB
Page 6: ...vi Rockwell Automation Publication 2080 UM005E EN E March 2018 Preface Notes...
Page 10: ...x Rockwell Automation Publication 2080 UM005E EN E March 2018 Table of Contents Notes...
Page 173: ...Rockwell Automation Publication 2080 UM005E EN E March 2018 163 Quickstarts Appendix C...
Page 210: ...Rockwell Automation Publication 2080 UM005E EN E March 2018 200 Index Notes...
Page 211: ...Rockwell Automation Publication 2080 UM005E EN E March 2018 201...