MAINTENANCE
RX96 03/09
Maintenance Section 5-23
© 2009 Alamo Group Inc.
MAINTENANCE
Step lV.
Reach in from front or top of Main Housing and remove upper Output Shaft Cone Bearing (item # 23)
Step V.
From the top of Main Housing drive out top and bottom Bearing Cups (item # 23). Spacer (item # 12) will fall out
once lower bearing cup comes out of housing.
PARTS INSPECTION
Step I
Inspect and Clean all Parts. Check Bearings, Shafts, Gears, Housing and Covers. Shafts should be inspected
at Seal wear areas, Bearing areas, Splines, Threads and all surface areas. Check Housings for cracks and
condition of all holes that are threaded. Check Housing and covers where Seals drive in for Burrs and
scratches. If Bearing Cones are replaced always replace Cups with them. Gears should not have and rough
surfaces where the gears run together. On Main Housing remove any old Gasket Sealer, Scratches, Wash and
completely clean it.
OUTPUT SHAFT INSTALLATION
STEP I
Install Upper Output Shaft Bearing Cup (item # 23) into Main Housing from the bottom. NOTE!: Direction
bearing cup must be installed. Insert spacer (item # 12). Install lower bearing cup (item #23) into main housing
and seat firmly against spacer (item # 12)
STEP II
Install Lower Bearing Cone (item #23) down over Output Shaft from top making sure it is firmly seated against
shoulder on Shaft.
STEP III
Insert Output Shaft (item # 22) into Main Housing from the bottom till Lower Bearing Cone is seated into Lower
Bearing Cup, Slide Upper Bearing Cone down over Output Shaft from the till it seats against and into upper
output Shaft Bearing Cup.
STEP IV
Slide Output Gear (item # 24) down over Output Shaft till it sits against upper Bearing Cone. NOTE!: Place one
shim (item # 7) between gear (item # 24) and top bearing.
STEP V
Install Output Shaft Bearing Adjusting nut (item # 25) Tighten Nut to set Pre-Load on Output Shaft Bearings.
Bearing Preload should be from 15 to 25 inch pounds of Rolling Torque.
STEP VI
Using Soft Metal (Brass or Aluminum) Pin, Strike both ends of Shaft with a hammer and recheck the Bearing
Pre-Load, This is to ensure Bearings and components are centered and seated. If Bearing Pre-Load is OK
insert Cotter Pin (item # 26) and Bend ends.
Summary of Contents for RX96
Page 8: ......
Page 9: ...Safety Section 1 1 2009 Alamo Group Inc SAFETY SECTION...
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ...Introduction Section 2 1 2009 Alamo Group Inc INTRODUCTION SECTION...
Page 85: ...Assembly Section 3 1 2009 Alamo Group Inc ASSEMBLY SECTION...
Page 97: ...Operation Section 4 1 2009 Alamo Group Inc OPERATION SECTION...
Page 144: ......
Page 145: ...Maintenance Section 5 1 2009 Alamo Group Inc MAINTENANCE SECTION...
Page 147: ...MAINTENANCE RX96 03 09 Maintenance Section 5 3 2009 Alamo Group Inc MAINTENANCE...
Page 148: ...MAINTENANCE RX96 03 09 Maintenance Section 5 4 2009 Alamo Group Inc MAINTENANCE...
Page 169: ......