MAINTENANCE
RX96 03/09
Maintenance Section 5-18
© 2009 Alamo Group Inc.
MAINTENANCE
Assembly Procedure for T - BOX
Assembly can be accomplished by reversing the disassembly procedure.
Figure 17
.
Step I.
Install spacer (4), gear (3), and bearing cones (8) onto shaft. If any shims were present between gear and
bearing or gear and spacer always reinstall at same location. Make sure that all parts are fully slated.
Step II.
Press new bearing cups into side caps (2).
Step III.
Assemble side cap (2) which was against the gear onto main housing using same shim pack as when
disassembled. If shim pack is not available use.030 inches of total shim thickness. Install capscrews and
tighten to recommended torque. Install three shaft assembly into housing with gear against the first side cap.
Step IV.
Assemble second side cap (2) onto main housing (7) using same shim pack as when disassembled or if not
available use.030 inch shim between cap and housing. Install capscrews (12) and tighten.
Step V.
Check bearing adjustment on rolling torque on cross shaft. If any play exists in shaft, shims must be removed
from side cap or cap opposite gear (3). Proper rolling torque should be 10 to 12 inch pounds. If preload is to
tight shims must be added under side cap opposite gear.
Step VI.
Input Hub Assembly
Press bearing cups into hub making sure they are fully seated. Press bearing cone onto shaft properly seated
against shaft shoulder. Assemble shaft into hub (12), add second bearing cone and gear. Apply a thin coat of
Liquid Lock (such as Locktite #270) to the shaft threads. Assemble adjusting nut and tighten to insure that all
parts are seated. Then loosen the adjusting nut until a rolling torque of 10 to 12 inch pounds is reached. Insert
cotter pin through shaft and adjusting nut. Bend cotter pin ends around radial surface of nut.
Do Not Bend
Cotter Over End of Shaft.
Step VII.
Assemble input hub into main housing using same shim pack as when disassembled. If not available use.020
inch shim to start. Install capscrews and tighten to recommended torque.
Step VIII.
Check backlash between gear set. Backlash should be.012 to.024 inches. If backlash is to small add shims
between main housing and input hub. Remove shims for excessive backlash.
Step IV.
Remove side caps one at a time, seal with sealer and reinstall. Repeat process for input hub assembly.
Gearbox is ready to be filled with good grade of NLGI 000 Grease. See maintenance section for specifications.
Summary of Contents for RX96
Page 8: ......
Page 9: ...Safety Section 1 1 2009 Alamo Group Inc SAFETY SECTION...
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ...Introduction Section 2 1 2009 Alamo Group Inc INTRODUCTION SECTION...
Page 85: ...Assembly Section 3 1 2009 Alamo Group Inc ASSEMBLY SECTION...
Page 97: ...Operation Section 4 1 2009 Alamo Group Inc OPERATION SECTION...
Page 144: ......
Page 145: ...Maintenance Section 5 1 2009 Alamo Group Inc MAINTENANCE SECTION...
Page 147: ...MAINTENANCE RX96 03 09 Maintenance Section 5 3 2009 Alamo Group Inc MAINTENANCE...
Page 148: ...MAINTENANCE RX96 03 09 Maintenance Section 5 4 2009 Alamo Group Inc MAINTENANCE...
Page 169: ......