
OPERATION
RX96 03/09
Operation Section 4-7
© 2009 Alamo Group Inc.
OPERA
T
ION
3.5 Drawbar-Pull Type Mower
For equipment operating at 540 RPM, the tractor
drawbar must be positioned at a 14” distance from
the hitch point to the PTO shaft end for proper
operation and minimal wear to the driveline.
Position the drawbar at 16” if the mower is a 1000
RPM unit.
If attaching the mower tongue clevis to a 3-point
hitch drawbar supported by the lower lift arms, the
attaching point must be extended past the main bar to allow for turning without binding the clevis and bar. Lift
arm stabilizers must be used with this type of drawbar to prevent the mower from swaying from side to side.
OPS-R- 0061_A
3.6 Front End Weight
A minimum of 20% total tractor weight must be maintained on the tractor front end at all times. Front end
weight is critical to maintain steering control and to prevent the tractor from rearing up while driving. If the
front end is too light, add weight until a minimum of 20% total weight is reached on the front tires. Front
weights and weight carriers can be purchased through an authorized tractor dealership.
OPS-U- 0005
Summary of Contents for RX96
Page 8: ......
Page 9: ...Safety Section 1 1 2009 Alamo Group Inc SAFETY SECTION...
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ...Introduction Section 2 1 2009 Alamo Group Inc INTRODUCTION SECTION...
Page 85: ...Assembly Section 3 1 2009 Alamo Group Inc ASSEMBLY SECTION...
Page 97: ...Operation Section 4 1 2009 Alamo Group Inc OPERATION SECTION...
Page 144: ......
Page 145: ...Maintenance Section 5 1 2009 Alamo Group Inc MAINTENANCE SECTION...
Page 147: ...MAINTENANCE RX96 03 09 Maintenance Section 5 3 2009 Alamo Group Inc MAINTENANCE...
Page 148: ...MAINTENANCE RX96 03 09 Maintenance Section 5 4 2009 Alamo Group Inc MAINTENANCE...
Page 169: ......