
MAINTENANCE
RX96 03/09
Maintenance Section 5-6
© 2009 Alamo Group Inc.
MAINTENANCE
DRIVELINE LUBRICATION
Grease Fittings are located on the Cross Assembly of each U-Joint and on the telescoping tubes. Grease the
U-Joint after each 8 hours of use.
Figure MntP-R-0049 & MntP-R-0050
. Do not force grease through the
Needle Cup Assemblies. Grease the telescoping tubes after every 8 hours use. Some PTO-to-Hitch
connections may necessitate cutting a hole in the shields to be able to align the Grease Fitting holes for
lubrication. Lubricate the shield bearings every 20 hours.
Figure Mnt-R-0252
.
DRIVELINE SHIELD REMOVAL
The Driveline Integral Shields should not become dented or otherwise damaged. The Integral Shield Assembly
has a Nylon Bearing at each end and should turn freely. This nylon bearing should require lubrication every 20
hours. To remove the integral shields for replacement or repair remove metal screw in area close to shield
cone. Grab cone and tube and twist tube relative to cone until white tab of bearing aligns with opening in shield
cone. Pull on tube to remove complete shield half from bearing and drive half. Repeat procedure for other half
of drive.
Make certain that the Driveline Integral Shields are free to telescope and rotate around the
Driveline without binding.
Summary of Contents for RX96
Page 8: ......
Page 9: ...Safety Section 1 1 2009 Alamo Group Inc SAFETY SECTION...
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ...Introduction Section 2 1 2009 Alamo Group Inc INTRODUCTION SECTION...
Page 85: ...Assembly Section 3 1 2009 Alamo Group Inc ASSEMBLY SECTION...
Page 97: ...Operation Section 4 1 2009 Alamo Group Inc OPERATION SECTION...
Page 144: ......
Page 145: ...Maintenance Section 5 1 2009 Alamo Group Inc MAINTENANCE SECTION...
Page 147: ...MAINTENANCE RX96 03 09 Maintenance Section 5 3 2009 Alamo Group Inc MAINTENANCE...
Page 148: ...MAINTENANCE RX96 03 09 Maintenance Section 5 4 2009 Alamo Group Inc MAINTENANCE...
Page 169: ......