
MAINTENANCE
RX96 03/09
Maintenance Section 5-11
© 2009 Alamo Group Inc.
MAINTENANCE
BLADE CARRIER INSTALLATION
Clean the splines on both the blade carrier and output shaft. Position carrier on the gearbox output shaft and
install special washer nut.
Tighten nut holding blade carrier to minimum 450 ft. pounds, strike the carrier near the hub several times with a
heavy hammer to seat the hub. Use a suitable spacer over the nut to prevent damage to the nut and threads.
Retighten the nut to 450 ft. pounds. Install cotter pin and spread.
Always recheck gearbox output shaft slotted blade carrier retaining nut torque after a few
hours operation.
Avoid personal injury. Do not work under cutter without support blocks to keep frame from
falling.
BLADE TIMING AND ROTATION
Blades on multi-spindle mowers overlap cutting paths to ensure a complete cut across the width of the mower
and to compensate for blade tip wear. If a gearbox has been repaired, a blade carrier or side driveline has been
removed, or other maintenance performed which altered the factory set blade carrier timing, the blades must
be re-timed to ensure they will not collide while rotating.
(FIGURE Mnt-R-0102)
Summary of Contents for RX96
Page 8: ......
Page 9: ...Safety Section 1 1 2009 Alamo Group Inc SAFETY SECTION...
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ...Introduction Section 2 1 2009 Alamo Group Inc INTRODUCTION SECTION...
Page 85: ...Assembly Section 3 1 2009 Alamo Group Inc ASSEMBLY SECTION...
Page 97: ...Operation Section 4 1 2009 Alamo Group Inc OPERATION SECTION...
Page 144: ......
Page 145: ...Maintenance Section 5 1 2009 Alamo Group Inc MAINTENANCE SECTION...
Page 147: ...MAINTENANCE RX96 03 09 Maintenance Section 5 3 2009 Alamo Group Inc MAINTENANCE...
Page 148: ...MAINTENANCE RX96 03 09 Maintenance Section 5 4 2009 Alamo Group Inc MAINTENANCE...
Page 169: ......